small but important correction... > However, when society industrialised, a rigid, five-day, 40-hour workweek arose in factory settings ummm... no. More like the 6 day 16 hour per day work-week arose in factory settings. The five-day, 40-hour workweek was fought and died for by the labor movement.
in tech, we don't really have 40hr/wk. It's more like 80hr/wk. And work on weekends. If you have a position that requires 40hrs/wk or less and no work on weekends whatsoever, consider yourself lucky. I hear stories about colleagues being overworked on continuous basis.
The non-linear workdays changing the shape of productivity
21–30 of 78 posts
Re: The non-linear workdays changing the shape of productivity
#22small but important correction... > However, when society industrialised, a rigid, five-day, 40-hour workweek arose in factory settings ummm... no. More like the 6 day 16 hour per day work-week arose in factory settings. The five-day, 40-hour workweek was fought and died for by the labor movement.
in tech, we don't really have 40hr/wk. It's more like 80hr/wk. And work on weekends. If you have a position that requires 40hrs/wk or less and no work on weekends whatsoever, consider yourself lucky. I hear stories about colleagues being overworked on continuous basis.
If you have a position that requires more than 40 hours a week regularly, do the math on your hourly rate, and look at hour its affecting your health. If you’re under 25 you’ll probably get away with it, if not the second order impacts on your life are not insignificant, and can make you less productive.
Re: The non-linear workdays changing the shape of productivity
#23Something that the software industry has to assimilate eventually is that unless your organization is very efficient, there's not a big difference between working for 6 or 10 hours a day. Scrum / agile / whatever as understood by most companies does not prevent context switching, synchronous work that could be done asynchronously, and interruptions. When added together, those things shrink your team's capacity massiv…
Re: The non-linear workdays changing the shape of productivity
#24small but important correction... > However, when society industrialised, a rigid, five-day, 40-hour workweek arose in factory settings ummm... no. More like the 6 day 16 hour per day work-week arose in factory settings. The five-day, 40-hour workweek was fought and died for by the labor movement.
Quoted post unavailable.
Increases in productivity probably help, but you could say the same thing about the last 30 years — a time when globally wage growth has been flat for most.
Time again, history shows labor rights are demanded not given, except for the few industries where people are most valuable asset of a company.
Re: The non-linear workdays changing the shape of productivity
#25small but important correction... > However, when society industrialised, a rigid, five-day, 40-hour workweek arose in factory settings ummm... no. More like the 6 day 16 hour per day work-week arose in factory settings. The five-day, 40-hour workweek was fought and died for by the labor movement.
in tech, we don't really have 40hr/wk. It's more like 80hr/wk. And work on weekends. If you have a position that requires 40hrs/wk or less and no work on weekends whatsoever, consider yourself lucky. I hear stories about colleagues being overworked on continuous basis.
Re: The non-linear workdays changing the shape of productivity
#26Earlier quoted context omitted.
in tech, we don't really have 40hr/wk. It's more like 80hr/wk. And work on weekends. If you have a position that requires 40hrs/wk or less and no work on weekends whatsoever, consider yourself lucky. I hear stories about colleagues being overworked on continuous basis.
I assume this is referring to the US? I don’t know anyone who does much over 40 hours in the UK, let alone anything close to 80 hours. A few might pick up urgent tasks on the weekend, but only when needed and not regularly.
Re: The non-linear workdays changing the shape of productivity
#27Earlier quoted context omitted.
Quoted post unavailable.
Productivity gains do not lead to increased worker benefit, they lead to increased owner benefit. Organized labor leads to increased worker benefit.
You shouldn’t state opinions as fact.
Re: The non-linear workdays changing the shape of productivity
#28Earlier quoted context omitted.
Quoted post unavailable.
If the length of our work week followed productivity, the workweek would be at 13 hours today. Your claim is completely and utterly baseless.
Re: The non-linear workdays changing the shape of productivity
#29A great way to get burned out as work encroaches on every aspect of your life. No thank you.
I work exactly as this article describes, but 25 hours per week. It feels like I am doing the productive 25 hours of a 37 hour work week. I log my hours pretty accurately, which I think makes it a better deal for my employer - no commuting, nothing social, and I'm picking the most productive hours for me. I've also got some freedom to switch between tasks (writing, coding, it's largely only teaching needs me to stick…
Some people need training & mentorship. It's a terrible arrangement for them, too.
For experienced staff who are comfortable working with minimal support & direction, it's been the Best Thing Ever.
Not everything suits everyone, and that's okay.
Re: The non-linear workdays changing the shape of productivity
#30non-contiguous?