Earlier quoted context omitted.
Agreed, it was just important to me to point it out, since staying within such a massive budget on such a long timeline is a rare achievement.
Considering the original title is just the name of the railway, and I do not think “within budget” is editorializing, I think the commenter is being overly pedantic
Koralm Railway
31–40 of 206 posts
Re: Koralm Railway
#32Earlier quoted context omitted.
To contrast, HS2 here in the UK has cost £40 billion (€45 billion) to date with a further £25 billion (€28 billion) allocated, for a largely superterranean route of 230km.
As badly as HS2 has been run, apart from the tunnel length (where HS2 has not too much more than this project) these projects are night and day different. Not just that HS2 Phase 1a/1b is almost double the length and significantly higher design speed (360km/h vs 250km/h), but they are in a different league in terms of civil engineering from the info I can see - this seems to have less than 80 structures (overpasses,…
Doesn't tunnel beat any of those structures in terms of cost/complexity?
Re: Koralm Railway
#33First, this is a massive accomplishment. When I looked at the Wiki page: https://en.wikipedia.org/wiki/Koralm_Railway ... it looks like a multi-multi-multi-phase project. Hats off to making this work. Second, I noticed how long it took to build this tunnel: Koralm Tunnel -> https://en.wikipedia.org/wiki/Koralm_Tunnel It is 33km, and it took from 2008 to 2025 to build it. That is a damn long time! The Toei Oedo line i…
It is very strange that countries like Austria, Japan or Switzerland have some of the best rail systems in the world even though their bridge and tunnel requirements are huge. In the US building rail on any terrain seems to be more expensive than basically anything one can build in Austria.
Re: Koralm Railway
#34I thought this was about the new base tunnel under the Alps and was very confused for a bit.
Re: Koralm Railway
#35Earlier quoted context omitted.
7x longer for 11x the cost seems pretty good all things considered. Always thought it seemed like a waste to not also dig out a bunch of storage while we're down there. I'm sure there are good reasons we don't
It's not seven times longer. The Austrian line is 130km with 50km of tunnels. Length Tunnels Bridges Stations Cost Koralm 130km ~50km 100 12 €6b HS2 230km ~75km 100+ 4 €74b+ Obviously this does not give any indication of the complexity of each project. Tunnelling and building railway through a metropolis I would imagine is quite challenging.
Re: Koralm Railway
#36Re: Koralm Railway
#37Earlier quoted context omitted.
As badly as HS2 has been run, apart from the tunnel length (where HS2 has not too much more than this project) these projects are night and day different. Not just that HS2 Phase 1a/1b is almost double the length and significantly higher design speed (360km/h vs 250km/h), but they are in a different league in terms of civil engineering from the info I can see - this seems to have less than 80 structures (overpasses,…
> this seems to have less than 80 structures (overpasses, bridges, underpasses etc.) whereas HS2 has 175 bridges and 52 viaducts. Doesn't tunnel beat any of those structures in terms of cost/complexity?
The longest road tunnel in the world only cost about 100 million in the 90s for 25km so tunneling isn't always a gigantic Big Dig style clusterfuck.
In terms of legal complexity, it's fantastically easier than picking your way across and near thousands of individual plots of very expensive land owned by people with solicitors salivating at the potential fees, expensive private infrastructure, nature reserves and so on.
Re: Koralm Railway
#38Earlier quoted context omitted.
It is mostly within budget, estimated in 2005 were 5.5 billion €, total cost as of today are 5.9 billion €, the difference being largely attributed to the pandemic and later addition of sections.
To contrast, HS2 here in the UK has cost £40 billion (€45 billion) to date with a further £25 billion (€28 billion) allocated, for a largely superterranean route of 230km.
Re: Koralm Railway
#39There aren't any big mountains between Graz and Klagenfurt. It's an hour on the Autobahn. That it took three hours by train... well, they just had shitty railroad? Best of luck, Southern neighbors!
Re: Koralm Railway
#40First, this is a massive accomplishment. When I looked at the Wiki page: https://en.wikipedia.org/wiki/Koralm_Railway ... it looks like a multi-multi-multi-phase project. Hats off to making this work. Second, I noticed how long it took to build this tunnel: Koralm Tunnel -> https://en.wikipedia.org/wiki/Koralm_Tunnel It is 33km, and it took from 2008 to 2025 to build it. That is a damn long time! The Toei Oedo line i…