This sounds big enough to require a black start. Unfortunately, those are slow and difficult. If an entire nation trips offline then every generator station disconnects itself from the grid and the grid itself snaps apart into islands. To bring it back you have to disconnect consumer loads and then re-energize a small set of plants that have dedicated black start capability. Thermal plants require energy to start up…
Just to add, I was at a University campus when the entire building's electrics went out and there was a significant pull due to relatively powerful computers in every room. They initially tried to bring the building back online altogether and failed. Then they tried to bring it back in sections and failed too. In the end they ended up going into each lab, turning every computer off at the wall to bring each lab's pow…
Or look at Apollo 13. The astronauts had turned off everything possible because they had lost their generator and only had their batteries. And it took a lot of furious planning by the guys on the ground to come up with a sequence of turning things back on that didn't cause the peak draw to go too high. Can't go too fast or it trips. Can't start too early because the power is limited, but can't start too late because the systems have to be up when they hit the atmosphere.