It is heartrending to realize that they were given one last chance to step back from the abyss, when cracks appeared, but they pressed on regardless. If something happens that you don't understand, it's time to halt and reevaluate. It bugs me that FIGG (one of the contractors) appears to be threatening the professional licenses of the engineers who helped the Miami Herald's investigation, by suggesting that doing so…
As a licensed Professional Engineer, you have to be quite careful criticizing other engineers. As long as the engineer signing off met "standard practices", he is covered and saying that he is not could get you in quite hot water.
In addition, while it is certainly possible that the engineer screwed up, it is also not impossible that the concrete may have been substandard, installation instructions may not have been followed, etc.
For example, in the Citibank Tower, the design was incorrect for quartering winds. However, Bethlehem Steel, the steel supplier, suggested cheaper bolted connections which made the problem worse.
http://www.engineersjournal.ie/2015/12/08/citicorp-centre-to...
Engineering failures are often a chain. That's why the NTSB has to be allowed to do its work.