But is it only BER? As mentioned int the article - what about Stuttgart 21 ( https://en.wikipedia.org/wiki/Stuttgart_21 ) etc.? It is possible that these sites exist as new financial "loopholes", transferring tax-money from the government to private contractors without much oversight.
Montreal had a different sort of airport fiasco in the 1960s and 70s: Mirabel Airport was supposed to replace the Dorval Airport as the "Eastern Gateway to Canada" for human travellers. Today, Mirabel is mostly a cargo airport. And the terminal is being demolished... Meanwhile, Dorval was expanded several times. Also, it was renamed the Trudeau airport. See https://en.wikipedia.org/wiki/Montr%C3%A9al%E2%80%93Mirabel_…
How Berlin’s Futuristic Airport Became a $6B Embarrassment
121–130 of 210 posts
Re: How Berlin’s Futuristic Airport Became a $6B Embarrassment
#122Earlier quoted context omitted.
The theory that is taken out of the drawer in such occasions is that the airport will have "a positive economical impact on the whole region, so the calculation isn't that simple". Sometimes it works, but in most cases it doesn't.
If "the calculation isn't that simple" how come the politicians think they can figure out the solution, but the collective hivemind of demand and offer by literally all participants of the economy cannot?
About the only thing large masses of people ever seem to accomplish is throwing fuel into various metaphorical fires.
Re: How Berlin’s Futuristic Airport Became a $6B Embarrassment
#123This is exactly what you expect to happen when you're redesigning the building in the middle of construction. If the project manager can't say no then it's pretty much guaranteed to be a disaster. On the plus side, it seems like they've finally found someone competent to fix the mess and move the project forward.
Meanwhile all the other issues like heavy equipment breaking tiles... none of that seems to be slowing it from opening.
So how did all the other systems wind up being more or less ready?
Re: How Berlin’s Futuristic Airport Became a $6B Embarrassment
#124Re: How Berlin’s Futuristic Airport Became a $6B Embarrassment
#125Re: How Berlin’s Futuristic Airport Became a $6B Embarrassment
#126Why do airports always need to be so ambitious? Usually the simple airports are best anyway.
The worst thing about BER is that it's designed to replace Tegel, which is easily the most sensibly built major airport in Germany. Space-efficient, cheap to operate, high-throughput, built very quickly with limited resources to solve a specific problem.
Re: How Berlin’s Futuristic Airport Became a $6B Embarrassment
#127I realize that higher standards of fire and other safety measures make these systems more complicated, but you would think that with all the technology we have today for planning, engineering, communication, documentation, modeling and simulation - that these types of fiascos would become rarer and rarer. I wonder if anyone has looked at large scale projects like these over the last 100 years and determined what impl…
We have a lot of powerful software for building design these days, Autodesk's Revit suite being the big one. But as in software development, better tools just ends up meaning that clients demand things faster and cheaper, rather than better. There are some classes of problems that it definitely helps solve, like keeping the structural engineer and HVAC engineer from design conflicts where a beam and a duct go through…
Re: How Berlin’s Futuristic Airport Became a $6B Embarrassment
#128I don't understand why the state funds airports. If people want airports, there is a demand, and that demand is either big enough to fund an airport and is satisfied, or it isn't because people don't want to spend that kind of money. Seems to me like something the state shouldn't be involved in.
Re: How Berlin’s Futuristic Airport Became a $6B Embarrassment
#129I realize that higher standards of fire and other safety measures make these systems more complicated, but you would think that with all the technology we have today for planning, engineering, communication, documentation, modeling and simulation - that these types of fiascos would become rarer and rarer. I wonder if anyone has looked at large scale projects like these over the last 100 years and determined what impl…
We have a lot of powerful software for building design these days, Autodesk's Revit suite being the big one. But as in software development, better tools just ends up meaning that clients demand things faster and cheaper, rather than better. There are some classes of problems that it definitely helps solve, like keeping the structural engineer and HVAC engineer from design conflicts where a beam and a duct go through…
Exact same thing in the arts field - not all clients of course, and I can't think of a recent equivalent to a fiasco of this scale, but the general trend is that clients feel when the cost of technology goes down so should other costs.