> Nuclear can’t do that You are repeating a myth. Load following is used in France: https://www.oecd-nea.org/nea-news/2011/29-2/nea-news-29-2-lo... It mostly isn't used in the US due to regulations. https://news.ycombinator.com/item?id=36254716 The reason load following is not generally used is because because the economics of nuclear (large fixed costs) favour base load.
You can technically use nuclear power plants as load followers in much thr same way that you can technically keep warm by setting $50 bills on fire. Load following with a nuclear plant basically means provisioning a 2GW plant and then using, say, 0.5GW of that - throwing away the rest. (since the vast majority of the cost is capex not fuel) Every kilowatt hour produced by that 2GW power plant is already 5x the cost o…
Pretty easy equation, much more reliable and much more scalable and not subject to the whims of the elements / can be done anywhere and on any planet in the solar system.