Widespread power outage in Spain and Portugal
841–850 of 1001 posts
Re: Widespread power outage in Spain and Portugal
#842Earlier quoted context omitted.
I remember talking to my ex's dad about his job, which involved planning refuels of a large nuclear-powered generation station in the Lower Midwest. The words "it's a miracle it works at all" routinely popped up in those conversations, which is... something you don't want to hear about any sort of power generation - especially not nuclear - but it's true. It's a system basically built to produce "common accidents". I…
If people knew how crappy, insecure, and unreliable nuclear computer systems were, there'd be a lot more existential dread about cyber security
What’s your source?
Re: Widespread power outage in Spain and Portugal
#843Earlier quoted context omitted.
I love the "analog" handcranked air compressor to 7MW generator escalation, it really captures human ingenuity. I wonder however how being part of the "continental Europe synchronous grid" affects this, and how it isolates to Portugal and Spain like this. But yeah there are a lot of capacitors that want juice on startup that happily kills any attempt to restore power. My father had "a lot" of PA speakers at home and…
I saw some ancient footage of an Me-109 fighter engine being started. A tech jumped on the wing and inserted a hand crank into a slot on the side. He threw all his might into turning it, and then after a delay the propeller started turning and coughed into life. I realized the tech must have been winding up a flywheel, and then the pilot engaged a clutch to dump the flywheel's inertia into the engine. The engineer in…
point of trivia: Messerschmitt, yes, but Bf-109, produced by Bayerische Flugzeugwerke.
you don't want to get your flugzeug works confused
Re: Widespread power outage in Spain and Portugal
#844Earlier quoted context omitted.
When the northeast blackout hit in 2003 in NYC I dont remember any panic. We still had house phones and they still worked in the blackout thanks to telcos being legally obligated to give a shit about reliability. I stopped by a friends house and we then went on a walk. Some stores were open and cash was accepted. We hung out later that night and had a few beers. The sky was amazing as there was next to no light pollu…
2003 was over two decades ago. Most people didn’t have mobile phones let alone smart phones. I’ve been in Lisbon today and it’s surreal being 100% cut off from friends and family back home and a big relief power is back on, we’ve become very used to and reliant on seamless instant connection. Our mindsets and how we live our lives with that instant communication is totally different to 22 years ago.
Maybe it depends on the country, but my memory of 2003 is almost every non-elderly adult I knew (in my own upper-middle class milieu) already had a mobile phone. Not a smart phone as we understand the term today, but a lot of phones back then had primitive smarts that are now largely forgotten, such as WAP/WML browsers (which maybe not many people used, but I certainly remember using one), JavaME applets (vaguely remember using them too-maybe post-2003, but higher end 2003 phones definitely could run them), vendor-specific mobile app formats such as Symbian
Re: Widespread power outage in Spain and Portugal
#845Earlier quoted context omitted.
> The words "it's a miracle it works at all" routinely popped up in those conversations, which is... something you don't want to hear about any sort of power generation - especially not nuclear - but it's true. Funny thing is, those are the exact words I use when talking to people about networking. And realistically anytime I dig deep into the underlying details of any big enough system I walk away with that impressi…
This is one of the key insights in my early SRE career that changed how I viewed software engineering at scale. Components aren’t reliable. The whole thing might be duct tape and popsicle sticks. But the trick for SRE work is to create stability from unreliable components by isolating and routing around failures. It’s part of what made chaos engineering so effective. From randomly slowing down disk/network speed to u…
Seek only to understand it well enough to harness the chaos for more subtle useful purpose, for from chaos comes all the beauty and life in the universe.
Re: Widespread power outage in Spain and Portugal
#846Earlier quoted context omitted.
If people knew how crappy, insecure, and unreliable nuclear computer systems were, there'd be a lot more existential dread about cyber security
I built control computers for nuclear reactors. Those machines are not connected to a network and are guarded by multiple stages of men with automatic machine guns. It was designed to flawlessly run 3x boards each with triple-modular-redundant processors in FPGA fabric all nine processors instruction-synced with ECC down to the Registers (including cycling the three areas of programmable fabric on the FPGAs). They cy…
Perhaps the safest assumption is that system reliability ultimately depends on quite a lot of factors that are not purely about careful engineering.
Re: Widespread power outage in Spain and Portugal
#847Earlier quoted context omitted.
In another life I worked as an engineer commissioning oil rigs and I’ve seen how tricky even a small-scale black start can be. On a rig, we simulate total power loss and have to hand-crank a tiny air compressor just to start a small emergency generator, which then powers the compressors needed to fire up the big ~7MW main generators. It's a delicate chain reaction — and that's just for one isolated platform. A full g…
bringing islands together requires one to synchronize both -- frequency and phase. It is super difficult for large generators and transmission lines. transient heat dissipation can be a real bummer.
And then phase will align itself a couple times a minute so what's difficult about that part?
Re: Widespread power outage in Spain and Portugal
#848Earlier quoted context omitted.
I saw some ancient footage of an Me-109 fighter engine being started. A tech jumped on the wing and inserted a hand crank into a slot on the side. He threw all his might into turning it, and then after a delay the propeller started turning and coughed into life. I realized the tech must have been winding up a flywheel, and then the pilot engaged a clutch to dump the flywheel's inertia into the engine. The engineer in…
> Me-109 fighter point of trivia: Messerschmitt, yes, but Bf-109, produced by Bayerische Flugzeugwerke. you don't want to get your flugzeug works confused
BTW, since we are Birds of a Feather, I bet you'd like the movie "The Blue Max". It's really hard to find on bluray, but worth it! The flying sequences are first rate, and no cgi.
Re: Widespread power outage in Spain and Portugal
#849Earlier quoted context omitted.
Grid tied solar won't put power into the grid when the grid is down. It's the one reason I didn't grid tie. Non tied solar won't affect the grid at all. So this is a non-issue. Grid tie requires the grid to tie to, otherwise it can't synchronize. So it stays disconnected.
Youre missing my point. I know that; I mean if you are restarting the grid and say you have a segment you think has 5MW of load that will come online, but you connect it and a minute or two later suddenly 2MW of grid tied solar detects the grid and starts exporting and you now have 3MW of load it is going to make it much more tricky to balance the restart. I'm not sure how much of a problem this is in reality but it…
I really thought that sentence was going to end with "it makes it a lot easier to handle that segment".
Yeah you have some big problems if it's a complete surprise, but your status quo monitoring would have to be very strangely broken for it to be a complete surprise. Instead it should be a mild complicating factor while also being something that reduces your load a lot and lets you get things running quicker.
Re: Widespread power outage in Spain and Portugal
#850Earlier quoted context omitted.
Same with Satifactory, The larger powerplants need a lot of energy for their infrastructure to run and an overload will trip breakers and shut the whole grid down, a naively designed grid death spirals very easy. My factory was needing increasingly complicated black start systems so I started putting the powerplant infrastructure on a self contained islands. something a factory overload would not trip, it was somethi…
Thinking about this makes me wonder how all real world power plants aren't designed to survive a grid outage? Why would you ever need to black start a real power plant? Like, can't you design it so that it disengages from the grid rather than shutting down in a catastrophic outage like this? Or make it only take on a fraction of the load or something?