> Software engineering. During early testing, Stripe reported that Fable 5 compressed months of engineering into days. In a 50-million-line Ruby codebase, the model performed a codebase-wide migration in a day that would otherwise have taken a whole team over two months by hand. How was it measured? How was the output of this magnitude verified over a period of couple of days?
EDIT: to be clear, it's still quite a helpful thing in terms of time saved, I just don't think it's necessarily the best indication of value-added from making models smarter when cases like this can often be handled by well-directed swarms of smaller ones.