As always with nuclear the questions are cost, time and waste. Until there is an actual breakthrough on (at least) one of those three issues we're going no where.
Those are non-problems: https://whatisnuclear.com/waste.html and https://whatisnuclear.com/economics.html .
Recent new construction of nuclear plants in the west has been fraught with boondoggle. The troubles with the Westinghouse AP1000 have been the most distressing to me personally, since the design was to be the conquering hero of the Nuclear Renaissance I was so excited about in nuclear engineering undergrad back in the mid-2000s. The July 2017 cancellation of the two AP1000s at VC Summer, the astronomical delays and overruns at Plant Vogtle, and the bankruptcy of Westinghouse were all devastating.
Non-problems?