If you like tunnels, there will be 200km of tunnels built by 21 boring machines at the same time between 2020 and 2030 around Paris : https://en.wikipedia.org/wiki/Grand_Paris_Express
Any detail specifically on the tunnels? That just mentioned 200km of track, but not whether above or below grade
The Boring Company’s Las Vegas tunnel is nearly 50% done
281–290 of 303 posts
Re: The Boring Company’s Las Vegas tunnel is nearly 50% done
#282Earlier quoted context omitted.
Most of the costs are also emergency systems, such as ventilation and frequent exits. From what I've seen (I'm not an engineer or a tunnel expert), his tunnels do not account for these things. The standards, which cost a lot to meet, are there for a reason.
What I am skeptical about is putting large car batteries in tunnels, which store enormous amounts of energy that could potentially be released in combustion and need be managed by adequate ventilation and fire suppression systems. Versus an electric train. Theoretically, since the energy is transported into the tunnel via power lines, wouldn’t fire suppression and ventilation systems be cheaper since they wouldn’t ne…
Re: The Boring Company’s Las Vegas tunnel is nearly 50% done
#283Earlier quoted context omitted.
> What you don't seem to understand is that the battery tech's problems currently are not the chemical process or format of the cells, but the volume. > So no this is not only about vision, Tesla (whether Musk himself or his engineers) identified a real problem, and engineered a real solution - the gigafactory So, Musk identified a problem (manufacturing batteries at scale), found a vendor with a solution (Panasonic)…
> Do you see my point now? Not really, what is your point? Every car manufacturer uses parts sourced from other companies - software, parts of engines, whole engines, whole gearboxes, complete modules, raw materials... That's how the industry works...
> and engineered a real solution
So, which is it? Did he outsource the parts like every other company or did he engineer a solution?
Re: The Boring Company’s Las Vegas tunnel is nearly 50% done
#284Earlier quoted context omitted.
Imo big infrastructure needs like roads and subways shouldn't be done on a project basis at all. For instance, NYC shouldn't bid and build out massive contracts for a few km of subway. They should own a boring machine and add 10-100m of tunnels a week, every week[0]. (numbers arbitrary) You can shake so much overhead around project start-up and shut-down and it will be a long time before NYC (nevermind someplace like…
But why there is a need to paint it all the time?
Otherwise every 20 years they would need to hire, train, then fire 200 painters for a 6 month-long paint job project. 200 painters, managers, and etc. who will invariably be less experienced with the finer points of painting said bridge since they don't do it every day.
Re: The Boring Company’s Las Vegas tunnel is nearly 50% done
#285ELI5... why is digging a tunnel tech news? Does Elon dig them faster or more cheaply or something? Otherwise do I submit this to HN? https://www.sydneymetro.info/tunnelling . I think tunnels are the future though for cities. But I'd prefer trains to be running in them, or roads that only allow electric public transport. Edit. In 1988 they started work on the Channel Tunnel UK to France: https://en.wikipedia.org/wiki/…
I think this follows Elons pattern of being able to find areas where the fundamental technology has advanced and is available, but the integration and step up to a new level hasn't been invested in yet. I think the Boring company basically made more efficient custom built tunneling equipment.
Not quite. The company has standard COTS tunneling equipment but an above par and well financed marketing and propaganda machine. That's it.
And hyperloop is another bullshit story as well.
Re: The Boring Company’s Las Vegas tunnel is nearly 50% done
#286Earlier quoted context omitted.
And Tesla's Gigfactory is a JV with Panasonic and partially funded by taxpayers. I'd say the largest value add about Elon Musk is his ability to create a reality distortion field to convince large swathes of people to follow his dream. I'm actually not being critical of Musk here. Jobs did this and you can see how transformative certain technologies have been as a result.
Musk and Jobs having strong visions and making them happen so that we can all benefit is denigrated as "reality distortion field"?
Let's put it in perspective: London is covered by a network of small tunnels dedicated to cart mail around by autonomous vehicles. The tunnels were opened almost a century ago.
Re: The Boring Company’s Las Vegas tunnel is nearly 50% done
#287Earlier quoted context omitted.
It's confusing because the way the units are represented is inconsistent.
You find the 'yr' confusing?
Re: The Boring Company’s Las Vegas tunnel is nearly 50% done
#288Earlier quoted context omitted.
If you want to build subways in less time for less money, the from-first-principles conclusion is that cut-and-cover is stupendously cheaper and quicker than tunneling. But nobody wants to be the one who signs off on "long sections of major roads closed for months at a time over a period of several years".
You can’t really do multiple layers of tunnels with cut and cover. It also requires the tunnels to follow where you can actually cut instead of the most direct route.
Sure you can. I ride such a line every week day.
True about the most direct route, but having uncontested right of way tends to make a big difference in travel times. And in grid layouts, where you want to go is closely aligned to how you get there.
Re: The Boring Company’s Las Vegas tunnel is nearly 50% done
#289Earlier quoted context omitted.
Lesson: don't do one-off projects. Find a project that meets you needs, and copy it. Make minor tweaks to their design to fit your needs, but copy as much as possible. Houses typically go according to plan because so many of the processes and parts are standard. Even large mansions can go according to plan if you have good management (note that cheap management is rewarded for change orders and thus will ensure thing…
Imo big infrastructure needs like roads and subways shouldn't be done on a project basis at all. For instance, NYC shouldn't bid and build out massive contracts for a few km of subway. They should own a boring machine and add 10-100m of tunnels a week, every week[0]. (numbers arbitrary) You can shake so much overhead around project start-up and shut-down and it will be a long time before NYC (nevermind someplace like…
The Project Production Institute take a similar view: that instead of modeling a project as a fixed thing, you focus on it as a production process.
Re: The Boring Company’s Las Vegas tunnel is nearly 50% done
#290Earlier quoted context omitted.
A large fraction of NYC's subway system was built using cut-and-cover, which is much cheaper than the deep tunneling being used for projects like the Second Avenue line or the East Side Access. That's before adding other factors such as increase regulation, inflation and good ol' corruption.
That and there was no EPA, no environmental design reviews, not much permitting, lax or zero safety standards (today it is a huge deal when somebody dies on a construction project... no so much back then). There was no ADA accessibility standards, no elevators or required wheelchair access, there was very little underground. If all the businesses along the block you are trenching through back then went under... so fu…