I wonder if the tribes have enough autonomy to build transmission lines quickly. Just the Navajo Nation can build enough solar/wind and transmission lines within their reservation and probably connect to the grids in Colorado, New Mexico, Utah and Arizona. US is incredibly slow in building transmission lines, takes decades. And, if they have enough autonomy to import Chinese panels (50% cheaper), a network of these n…
The Ute Tribe will construct one of the largest solar farms in the US
191–200 of 302 posts
Re: The Ute Tribe will construct one of the largest solar farms in the US
#192Whenever I see comments about how slow public projects are these days, I think about this documentary: https://www.pbs.org/wgbh/americanexperience/films/race-under... It's a PBS special about the history of the Boston subway (which was one of the first in the nation). To give you an idea of what construction safety was like back then, they would routinely encounter gas lines, cut them WITHOUT turning off the gas, and…
That's still done today, evidently! A few months back, there was a small gas leak in my neighborhood. When they knocked on my door to say they'd be working in the area, the repair crew leader was kind enough to indulge my questions.
I asked them if my gas would be shut off. They said no, they do the work while the gas is still on!
And they must have been cutting into the gas line because they replaced a section that ran under the street. They used a backhoe to dig huge holes on both sides of the street and then fed a flexible pipe through.
Here's a video about something kind of similar: https://www.youtube.com/watch?v=UCMs__ZnOfA
I'm sure today's techniques are different and much safer, so I don't think it negates your point that they used to do risky stuff.
Re: The Ute Tribe will construct one of the largest solar farms in the US
#193I wonder if the tribes have enough autonomy to build transmission lines quickly. Just the Navajo Nation can build enough solar/wind and transmission lines within their reservation and probably connect to the grids in Colorado, New Mexico, Utah and Arizona. US is incredibly slow in building transmission lines, takes decades. And, if they have enough autonomy to import Chinese panels (50% cheaper), a network of these n…
May be start the manufacturing facility here and start panel manufacturing here itself !!
Prerequisites for manufacturing panels here at an even remotely competitive price includes reducing labor costs and extracting/refining minerals at scale.
I absolutely agree we should onshore solar production but simply onshoring manufacturing isnt the first step. Frankly im not even sure the labor cost is even solvable. Will probably always have to utilize low foreign wages
Re: The Ute Tribe will construct one of the largest solar farms in the US
#194Whenever I see comments about how slow public projects are these days, I think about this documentary: https://www.pbs.org/wgbh/americanexperience/films/race-under... It's a PBS special about the history of the Boston subway (which was one of the first in the nation). To give you an idea of what construction safety was like back then, they would routinely encounter gas lines, cut them WITHOUT turning off the gas, and…
Safety usually isn't the problem. It's the public notice periods, feedback collection, final notices, environmental impact studies, lawsuits over whether the environmental impact studies were sufficient, possible need to get the government to invoke eminent domain, studies over which potential version of a project needs the least disruption, and so forth. Near where I live is a bridge over a river that needs replacin…
Right next door to that bridge are three other projects: a cliff/dirt collapse/erosion/retaining project that kept the river parkway closed for like 4 years, and two bridges being reconditioned that have been closed for 3. Those went through the "normal" channels.
Re: The Ute Tribe will construct one of the largest solar farms in the US
#195I wonder if the tribes have enough autonomy to build transmission lines quickly. Just the Navajo Nation can build enough solar/wind and transmission lines within their reservation and probably connect to the grids in Colorado, New Mexico, Utah and Arizona. US is incredibly slow in building transmission lines, takes decades. And, if they have enough autonomy to import Chinese panels (50% cheaper), a network of these n…
I know it took my local utility about 5 years just to run about 30 miles of HV wire from me seeing "announcment of public commentary" -> studies -> "final notice of commentary on route" -> building starts. The building itself took about 6 months, as it ran along a road I travel a lot. That's a long time for 30 miles of HV towers.
Re: The Ute Tribe will construct one of the largest solar farms in the US
#196Earlier quoted context omitted.
May be start the manufacturing facility here and start panel manufacturing here itself !!
Panels are a commodity at this point. I hate to say it but mineral extraction, processing and panel manufacturing will be way more expensive than importing from China. Prerequisites for manufacturing panels here at an even remotely competitive price includes reducing labor costs and extracting/refining minerals at scale. I absolutely agree we should onshore solar production but simply onshoring manufacturing isnt the…
Most likely, you will see a lot of made in Mexico/Caribbean/Canada
Re: The Ute Tribe will construct one of the largest solar farms in the US
#197Whenever I see comments about how slow public projects are these days, I think about this documentary: https://www.pbs.org/wgbh/americanexperience/films/race-under... It's a PBS special about the history of the Boston subway (which was one of the first in the nation). To give you an idea of what construction safety was like back then, they would routinely encounter gas lines, cut them WITHOUT turning off the gas, and…
we now build projects to relocate utilities (so that you don't have to shut down a subway line to replace an adjacent water pipe) but that stuff is costly and everyone is prepared to sue the other in case of a mess-up. but there is a lot of the physical version of tech debt; New York is still replacing wood and lead piping, for example.
Re: The Ute Tribe will construct one of the largest solar farms in the US
#198Earlier quoted context omitted.
May be start the manufacturing facility here and start panel manufacturing here itself !!
Panels are a commodity at this point. I hate to say it but mineral extraction, processing and panel manufacturing will be way more expensive than importing from China. Prerequisites for manufacturing panels here at an even remotely competitive price includes reducing labor costs and extracting/refining minerals at scale. I absolutely agree we should onshore solar production but simply onshoring manufacturing isnt the…
That doesn't sound sustainable at all to me.
Re: The Ute Tribe will construct one of the largest solar farms in the US
#199Earlier quoted context omitted.
And an AP1000 reactor costs about $6.8 billion to build, and substantially higher operating costs. 68% of the power for 14% of the price seems like a pretty good deal to me, there's a reason people are investing more in solar than nuclear, it's just more cost effective. edit: Oh, and that $6.8 billion looks optimistic. This project with two AP1000s looks like it costs $30 billion. https://www.ans.org/news/article-394…
This doesnt take into account capacity factors. A "800MW" solar plant would be expected to actually product 10-25% of that after day/night and seasons are taken into account. Nuclear plants are more of a 90+% capacity factor.
Nuke advocates do themselves no favors playing shell games and weasel words with the economics. Nuclear is expensive. The nuclear industry needs to figure out how to make it a lot cheaper. And no, it's not just the NIMBY regulation.
The legacy nuke industry has a ton of deeply embedded lobbying and relationships with the regulatory agencies and congress, including ancillary groups that do fuel rod reprocessing and waste transport, cushy high-cost satellite industries.
Nuclear is stuck in a rut. Economically viable nuclear needs a clean-slate redesign and all the old players need to be thrown out. Computer designs, modern software and sensors, materials, etc. Research LFTR to the wazoo.
One of the big pushes IMO should be the US Navy, which should start using nuclear power for all its fleet ships not just subs/carriers.
Re: The Ute Tribe will construct one of the largest solar farms in the US
#200Earlier quoted context omitted.
I know it took my local utility about 5 years just to run about 30 miles of HV wire from me seeing "announcment of public commentary" -> studies -> "final notice of commentary on route" -> building starts. The building itself took about 6 months, as it ran along a road I travel a lot. That's a long time for 30 miles of HV towers.
I'm ignorant of how this works, but aren't tribal nations exempt from at least state and local regs?