What exactly are you getting at? Datacenters do use potable water from municipal sources for evaporative cooling. Are you claiming that's not true? Here's a recent source: https://pacinst.org/publication/how-much-water-do-data-cente...
They do use water, and the numbers look very large which makes for big scary headlines. However people who actually know how water is used in a city are used to numbers much larger than that.
'People are going to get screwed' Pennsylvania voters unite against data centres
111–120 of 206 posts
Re: 'People are going to get screwed' Pennsylvania voters unite against data centres
#112Earlier quoted context omitted.
What exactly are you getting at? Datacenters do use potable water from municipal sources for evaporative cooling. Are you claiming that's not true? Here's a recent source: https://pacinst.org/publication/how-much-water-do-data-cente...
Some do, some use closed-loop systems that are essentially 'charge once'. higher energy use, but less water
Re: 'People are going to get screwed' Pennsylvania voters unite against data centres
#113Earlier quoted context omitted.
golf courses use much more. But you don’t see massive resistance against new golf courses being planned. Farms use an order of magnitude more than either. You don’t see any demands whatsoever on agriculture to reduce water usage.
I would expect that a golf course construction is relatively rare event. And there is definitely no explosion of new golf courses. Total DC power consumption growth is practically exponential for the last 5 years.
That's just status quo bias, given that they're an ongoing source of water consumption. "oh it doesn't matter that [thing] is guzzling water, because it's already there!".
Re: 'People are going to get screwed' Pennsylvania voters unite against data centres
#114Earlier quoted context omitted.
What exactly are you getting at? Datacenters do use potable water from municipal sources for evaporative cooling. Are you claiming that's not true? Here's a recent source: https://pacinst.org/publication/how-much-water-do-data-cente...
Why and how would they contaminate the water supply though? Sounds like a municipality problem, a water consumer shouldn't be feeding back into the system, or is it being caused by poorly executed construction practices? Maybe when they first pipe in or something is being left open during construction, this seems like it shouldn't happen if things are being done properly, water supply systems are not a new technology…
Re: 'People are going to get screwed' Pennsylvania voters unite against data centres
#115Earlier quoted context omitted.
Why and how would they contaminate the water supply though? Sounds like a municipality problem, a water consumer shouldn't be feeding back into the system, or is it being caused by poorly executed construction practices? Maybe when they first pipe in or something is being left open during construction, this seems like it shouldn't happen if things are being done properly, water supply systems are not a new technology…
The construction itself absolutely alters local watersheds: 1. Replacing forests and fields with concrete buildings prevents rainwater from filtering into the soil, which stops local aquifers from recharging. 2. During storms the rain runs off impervious surfaces and can cause downstream flooding. 3. Heavy land grading washes loose sediment into nearby waterways, destroying aquatic habitats and turning private drinki…
The first 3 apply to all construction. It's just being selectively applied because people hate datacenters.
Re: 'People are going to get screwed' Pennsylvania voters unite against data centres
#116Earlier quoted context omitted.
I would expect that a golf course construction is relatively rare event. And there is definitely no explosion of new golf courses. Total DC power consumption growth is practically exponential for the last 5 years.
>I would expect that a golf course construction is relatively rare event That's just status quo bias, given that they're an ongoing source of water consumption. "oh it doesn't matter that [thing] is guzzling water, because it's already there!".
Re: 'People are going to get screwed' Pennsylvania voters unite against data centres
#117Earlier quoted context omitted.
Concerns about noise pollution and increased electricity costs are just morons? What about concerns about air pollution from unregulated diesel generators? Or using large amounts of water in drought prone areas?
All of those can be addressed by proper regulation. Banning them outright is the equivalent of banning all immigration just because there's some particular subgroup that people hate.
No it can't. Regulation is already being flouted.
> Banning them outright is the equivalent of banning all immigration
Please be less obvious, this is just insulting.
Re: 'People are going to get screwed' Pennsylvania voters unite against data centres
#118Earlier quoted context omitted.
Why and how would they contaminate the water supply though? Sounds like a municipality problem, a water consumer shouldn't be feeding back into the system, or is it being caused by poorly executed construction practices? Maybe when they first pipe in or something is being left open during construction, this seems like it shouldn't happen if things are being done properly, water supply systems are not a new technology…
The construction itself absolutely alters local watersheds: 1. Replacing forests and fields with concrete buildings prevents rainwater from filtering into the soil, which stops local aquifers from recharging. 2. During storms the rain runs off impervious surfaces and can cause downstream flooding. 3. Heavy land grading washes loose sediment into nearby waterways, destroying aquatic habitats and turning private drinki…
Re: 'People are going to get screwed' Pennsylvania voters unite against data centres
#119Earlier quoted context omitted.
It typically takes 11-12 years for a nuclear plant to get built including planning and construction [1]. Is the idea that we'd build the data centers now, and finish the nuclear plants to power them 11-12 years from now? https://www.researchgate.net/figure/Typical-timeline-of-a-nu...
For wind turbine project from design and planning to operational use-takes approximately 4-7 years. An offshore wind turbine project requires about 7-10 years. https://jmhpower.com/how-long-does-it-take-to-build-a-wind-t...
* The longest piece for wind is "Approvals and permits" which takes up to 5 years of the 4-7y.
* The building part "takes approximately 3-6 months" for building wind.
So wind can be built far faster if we're willing to speed up approvals and permitting. And even if corners are cut for approvals/permitting, the worst case for a wind turbine failure is a lot better than a nuclear failure.
Re: 'People are going to get screwed' Pennsylvania voters unite against data centres
#120You tell everyone AI is going to put them out of a job and then you’re surprised when working class communities say “no, please leave” when folks want to build a data center in their back yard. There are times when Silicon Valley looks out of touch and there are times when Silicon Valley just looks like idiots with hubris. This is more the later.
There are many surveys which make it clear, this is not the reason. They are straightforwardly (right or wrong) protesting the physical installations, their water and electricity use, and other hard-to-quantify vibes like radiation and noise (similar to 5g protests). They know very little about the job market impact of AI, and are mostly retired so they don't care anyway.