Earlier quoted context omitted.
> Their design appears to have it roots in the (false) idea that what was holding back nuclear was perception of safety, rather than cost. And why do you think they cost so much? Because people need to believe they are safe from catastrophic failure
Large scale civil engineering projects will always cost more than simply installing stuff that comes almost fully assembled from a factory (solar, wind, battery or small/medium gas turbines). Opex will always be much higher for a generation facility which requires 850 FTE specialist employees to operate (US average per plant) compared to the minimal requirements for on-site employees for utility scale solar or wind f…
https://ifp.org/nuclear-power-plant-construction-costs:
> To sum up, since the early 1970s, the cost of constructing nuclear power plants in the U.S. has been steadily rising. This can be traced to a constantly shifting regulatory environment, which has continuously changed plant design requirements, and added more and more safety features, which often were required to be implemented on plants under construction. The regulatory environment is partially a reflection of the fact that nuclear power and the risks of radiation had become increasingly controversial, and that early understanding of the likelihood of a nuclear plant accident was often inadequate.