so in other words, heavily subsidize another technology (introducing cost shifts onto non-adopters, typically poorer people) to try and solve operational problems directly caused by oversubsidizing rooftop solar (another regressive cost-shift and extremely inefficient cost allocation relative to tx-connected solar) by bringing down wholesale prices (already a minority of the utility bill). Fixed costs, the majority o…
Wholesale power is ~37% of the customer bills. The other costs are the "poles and wires" distribution network and the HV transmission network. The government is also building out the transmission network to various renewable energy zones, which has the added benefit of making the transmission network more resilient. With large coal plants, the network was only one interconnector failure from blacking out a state (as…
The South Australia blackout was not caused by coal or renewables or lack of interconnectors. If there had been zero interconnects (the local grid was self-sufficient) it wouldn't have happened! The primary cause of the extended blackout was simply a lack of readiness/contingency planning/compliance particularly at several large windfarms. See wiki article.
Coal is generally cheaper for baseload power like an aluminum smelter, even though solar is cheaper during the day. Firming with wind/battery is not yet competitive but is getting very close and is at the point where building new coal power plants is not viable. Refer to gencost report. However, replacing such a large load with brand new renewable capacity is almost certainly more expensive than simply continuing to burn coal, particularly when factoring in the grid upgrades required to make such a transition.