From what I can tell, the DC buildout isn't going that well. I've been wondering about the current status of the projects because there hasn't been much in the news or here about new DC's coming online. This report summary makes the point that getting power to the datacenters with onsite generation is running into roadblocks from permitting to even finding turbines to buy. He who shouldn't be named (here) made the sa…
Oracle could face $7B collateral bill for Wisconsin data centre
11–20 of 116 posts
Re: Oracle could face $7B collateral bill for Wisconsin data centre
#12Re: Oracle could face $7B collateral bill for Wisconsin data centre
#13Five US tech giants' hidden debts soar to $1.65T on opaque AI funding
Re: Oracle could face $7B collateral bill for Wisconsin data centre
#14Earlier quoted context omitted.
One level above junk. Yikes.
The problem with Oracle is how much utterly and directly depends on them. They still are the authoritative source on "what is Java" and stuff like SAP directly depends on Java and in many cases Oracle Database (the supported alternatives are AFAIK IBM's mainframe stuff and MS SQL, but I only ever saw Oracle whenever I had the misfortune of having to dig into SAP). If Oracle goes down, a lot of businesses are going to…
Regarding Java, SAP has long switched over to openjdk (though oracle java is supported in some cases). Specifically, they have their own custom fork of openjdk "SapMachine" precisely to be independent from oracle (FYI: if you look at openjdk upstream you will see many core contributors are employed by SAP)
In general, I would say that the actual tech companies that have to interact with oracle's stuff are generally very well equipped to drop them or have already done so. The bigger issue are legacy "consumers" of oracle (e.g. if Pepsi has their data in oracle DB), which often do not have such contingencies.
Re: Oracle could face $7B collateral bill for Wisconsin data centre
#15From what I can tell, the DC buildout isn't going that well. I've been wondering about the current status of the projects because there hasn't been much in the news or here about new DC's coming online. This report summary makes the point that getting power to the datacenters with onsite generation is running into roadblocks from permitting to even finding turbines to buy. He who shouldn't be named (here) made the sa…
The idea that we can’t get enough electrical power on earth because of supply constraints, but that we can solve that by launching the datacenters and their entire support infrastructure into space makes no sense unless you’re a huckster trying to pump up your space launch business ahead of an IPO. There’s no way we are more constrained on land-based solar+battery equipment than we would be on space-worthy solar+batt…
Re: Oracle could face $7B collateral bill for Wisconsin data centre
#16Earlier quoted context omitted.
One level above junk. Yikes.
The problem with Oracle is how much utterly and directly depends on them. They still are the authoritative source on "what is Java" and stuff like SAP directly depends on Java and in many cases Oracle Database (the supported alternatives are AFAIK IBM's mainframe stuff and MS SQL, but I only ever saw Oracle whenever I had the misfortune of having to dig into SAP). If Oracle goes down, a lot of businesses are going to…
Re: Oracle could face $7B collateral bill for Wisconsin data centre
#17Related: S&P Global has lowered Oracle’s creditworthiness from BBB to BBB- https://news.ycombinator.com/item?id=48909768
every stock should have the chance to go to zero if we are to have a true Free Market.
Re: Oracle could face $7B collateral bill for Wisconsin data centre
#18Oracle cannot possibly be expecting to meet its bets here. My own empirical one-person observation is that my friend worked there in the group that went around the world standing up their new cloud datacenters, and he was there from basically 2019 to earlier this year. They laid him and half his team off earlier this year. Absolutely nonsensical if they're really building out cloud data centers. Because that's exactl…
Or possibly senior leadership isn’t happy with the pace of DC buildout over the last 5-years.
Re: Oracle could face $7B collateral bill for Wisconsin data centre
#19From what I can tell, the DC buildout isn't going that well. I've been wondering about the current status of the projects because there hasn't been much in the news or here about new DC's coming online. This report summary makes the point that getting power to the datacenters with onsite generation is running into roadblocks from permitting to even finding turbines to buy. He who shouldn't be named (here) made the sa…
The idea that we can’t get enough electrical power on earth because of supply constraints, but that we can solve that by launching the datacenters and their entire support infrastructure into space makes no sense unless you’re a huckster trying to pump up your space launch business ahead of an IPO. There’s no way we are more constrained on land-based solar+battery equipment than we would be on space-worthy solar+batt…
Re: Oracle could face $7B collateral bill for Wisconsin data centre
#20Earlier quoted context omitted.
The idea that we can’t get enough electrical power on earth because of supply constraints, but that we can solve that by launching the datacenters and their entire support infrastructure into space makes no sense unless you’re a huckster trying to pump up your space launch business ahead of an IPO. There’s no way we are more constrained on land-based solar+battery equipment than we would be on space-worthy solar+batt…
[flagged]