You can use CF and lose relevance. Or even go beyond that and outright geoip-block . Ofc it's your choice. For some reason there are many small sites I have no problem visiting and then there are those CF users which may or may not work at any given moment, forcing me to ignore them. Well, good luck. You are cutting yourself from the internet, not cutting me off.
Microsoft pulls plug on plans for 244-acre data center in Caledonia (2025)
141–150 of 201 posts
Re: Microsoft pulls plug on plans for 244-acre data center in Caledonia (2025)
#142Earlier quoted context omitted.
> Compared to the other industrial uses you'd get, data centers are almost certainly preferable. Why? The ratio of jobs and taxes to local resources tied up has to be one of the worst possible trade-offs of any industrial use that you can envision. That is precisely why data centers are proving to be profoundly unpopular. Compare and contrast to something like a Boeing assembly plant with thousands of high-paid skill…
> The ratio of jobs and taxes to local resources tied up has to be one of the worst possible trade-offs of any industrial use that you can envision Why? There aren't much "local resources tied up" since it's land that isn't that valuable for the most part. DCs, once built, don't emit fumes or loud noises, or make traffic worse like other industrial land use might. They just sit there quietly and generate tax revenue…
The people opposing data centers oppose them everywhere, including in the middle of the desert in Utah, which really gives away the game.
Re: Microsoft pulls plug on plans for 244-acre data center in Caledonia (2025)
#143What is the actual procedure through which this happens? You buy the land and then are granted permission on a discretionary basis? It seems to me that if you were a small business this becomes much harder to participate in because you need to acquire and hold the unproductive asset. This would mean that land use tends towards that which large firms (which can sustain the costs easily by self-financing) find useful.
Re: Microsoft pulls plug on plans for 244-acre data center in Caledonia (2025)
#144Earlier quoted context omitted.
In America electric rates are increasing due to 20 years of stagnation and failure to invest in transmission, and new data centers are on average associated with lower, not higher retail electric rates. This is because large consumers drive down marginal prices. In your country things may be proceeding differently, but that's the story here.
This doesn't really hold when we're talking about discrete pieces of infrastructure that may need to be built. If the current transmission infrastructure is fine for the current users, and then a new large user comes along that necessitates new infrastructure, that is a huge new cost that simply that simply didn't exist without that large user. I believe in many areas this is the kind of infrastructure investment tha…
Re: Microsoft pulls plug on plans for 244-acre data center in Caledonia (2025)
#145My first reaction is that 244 acres for a data center sounds absolutely obscene. But I have to admit that I'm coming from a place of ignorance. How big "should" a data center be? How big are some other data centers? How big is us-east-1, for an example of a large one? I'm finding this to be rather difficult information to google.
That's the land allocation rather than the building-size / data-centre size. The average data centre is 10,000 square metres (2.5 acres). As well as compute and network facilities, DCs also need to accommodate parking, personnel areas, cooling, fire-suppression, power substations, power redundancy (generators), ground-security… 244 acres is absolutely at the upper end of any DC site.
Re: Microsoft pulls plug on plans for 244-acre data center in Caledonia (2025)
#146Earlier quoted context omitted.
You pretty much need low latency 1G+ to work from home these days.
... do you? I have 500mpbs and both my partner and I WFH with no problems.
I've gotten by on McDonald's wifi
Re: Microsoft pulls plug on plans for 244-acre data center in Caledonia (2025)
#147Earlier quoted context omitted.
It’s unusual to buy the land and take a gamble on its utility, at least whenever datacenter construction is involved. Purchasing parties are risk averse to this exact scenario and work hard to craft contracts that reduce risk. Often the choices are — 1. Buy land at $/acre that reflects very little premium, based on a short feasibility study, but without any ultimate contingency that permitting will occur. This is you…
The second option also incentivizes the seller, who is often a local real estate magnate, to pressure local officials to issue the permits.
Re: Microsoft pulls plug on plans for 244-acre data center in Caledonia (2025)
#148Earlier quoted context omitted.
I'm not defending Cloudflare, but what is a better solution? If small websites can just be DDOS'd out of existence because some group thinks it'll be funny, what protections do they have? It takes too much equipment and know-how to stop an attack for people to be able to survive online. The next thing you'll hear about is a monthly service fee to the hackers as a protection racket just like the mob.
Websites should have a lean markdown or .txt page for each human friendly webpage. A lot of the surge in bots is because of LLMs. Its insane that a technical documentation web page can use 200MB + of memory, when the core information I care about is This is something that would be perfect for cloudflare to host and sell as a service - static web pages via their CDN network. I do not work in web development, so im sur…
Re: Microsoft pulls plug on plans for 244-acre data center in Caledonia (2025)
#149What is the actual procedure through which this happens? You buy the land and then are granted permission on a discretionary basis? It seems to me that if you were a small business this becomes much harder to participate in because you need to acquire and hold the unproductive asset. This would mean that land use tends towards that which large firms (which can sustain the costs easily by self-financing) find useful.
It'd be one thing if the requirements were merely onerous, but the discretionary nature adds corruption greatly favoring incumbents, the deep pocketed, and those willing to disregard the rules (start-ups with low capital requirements).
Never mind the timeline of these processes. Permitting can take 18-24 months, as can items like basic utility upgrades (adding 480V service, for instance, to an existing building can be an 18 month ~quarter million dollar endeavor.)
Re: Microsoft pulls plug on plans for 244-acre data center in Caledonia (2025)
#150My first reaction is that 244 acres for a data center sounds absolutely obscene. But I have to admit that I'm coming from a place of ignorance. How big "should" a data center be? How big are some other data centers? How big is us-east-1, for an example of a large one? I'm finding this to be rather difficult information to google.
That's the land allocation rather than the building-size / data-centre size. The average data centre is 10,000 square metres (2.5 acres). As well as compute and network facilities, DCs also need to accommodate parking, personnel areas, cooling, fire-suppression, power substations, power redundancy (generators), ground-security… 244 acres is absolutely at the upper end of any DC site.