Wealthy white exclave succeeds in using environmental justice language to keep cheap coal-fired power to themselves. Very American outcome. Although I obviously don't care about Microsoft's outcome here, this was clearly a great site at the intersection of two transmission lines and with essentially infinite water resources. The data center would have been built in this scene. https://www.google.com/maps/@42.8440852,…
Microsoft pulls plug on plans for 244-acre data center in Caledonia (2025)
21–30 of 201 posts
Re: Microsoft pulls plug on plans for 244-acre data center in Caledonia (2025)
#22Earlier quoted context omitted.
I support in principle the rights of towns to set their own land use rules, but on the larger societal picture I don't support people benefiting from things like intermodal shipping, goods distribution, and information services that they refuse to host. So I perceive a certain hypocrisy in this story.
Surely I benefit from a host of things for which I want nowhere near me. Strip mining, petroleum refining, chemical processing, coal fired electricity, etc. Am I allowed any autonomy or must we all accept that if a rich group wants to plop down a leather tanning factory across the street, I should have no recourse?
Re: Microsoft pulls plug on plans for 244-acre data center in Caledonia (2025)
#23Re: Microsoft pulls plug on plans for 244-acre data center in Caledonia (2025)
#24Wealthy white exclave succeeds in using environmental justice language to keep cheap coal-fired power to themselves. Very American outcome. Although I obviously don't care about Microsoft's outcome here, this was clearly a great site at the intersection of two transmission lines and with essentially infinite water resources. The data center would have been built in this scene. https://www.google.com/maps/@42.8440852,…
"a great site" -- you frame it like Microsoft was working for the public good
Re: Microsoft pulls plug on plans for 244-acre data center in Caledonia (2025)
#25Probably a wise decision on their part Microsoft already is all in on Copilot AI if it fails, the CEO probably is gone.
[0]: https://www.macrotrends.net/stocks/charts/MSFT/microsoft/sto...
Re: Microsoft pulls plug on plans for 244-acre data center in Caledonia (2025)
#26My first reaction is that 244 acres for a data center sounds absolutely obscene. But I have to admit that I'm coming from a place of ignorance. How big "should" a data center be? How big are some other data centers? How big is us-east-1, for an example of a large one? I'm finding this to be rather difficult information to google.
That's the land allocation rather than the building-size / data-centre size. The average data centre is 10,000 square metres (2.5 acres). As well as compute and network facilities, DCs also need to accommodate parking, personnel areas, cooling, fire-suppression, power substations, power redundancy (generators), ground-security… 244 acres is absolutely at the upper end of any DC site.
https://www.theverge.com/ai-artificial-intelligence/933687/u...
Most hyperscalers now prefer to build larger sites as “campuses” which may consist of many buildings each consuming 40-100MW, and then yes each building needs most of what you mentioned, so it adds up.
A few sites are now also contemplating BTM or ‘behind the meter’ power generation which takes additional space.
Then some sites like Microsoft’s Fairwater design are optimized for a very large number of Accelerator cabinets — think GPU, TPU, etc. Those cabinets are each consuming 140kW today and with a path to 700-1000kW cabinets soon, so that’s one super dense building instead of a campus of less dense buildings filled with Compute.
Re: Microsoft pulls plug on plans for 244-acre data center in Caledonia (2025)
#27Earlier quoted context omitted.
Some of us would like to keep our “infinite” water resources which actually aren’t infinite. I live beneath two transmission lines (overlapping, I guess, but not intersecting) and would prefer no data centre built here. Why? Because it will provide me no benefit whatsoever, reduce my property value, and worsen my quality of life due to things like light pollution and noise. If data centre operators would fix these th…
I support in principle the rights of towns to set their own land use rules, but on the larger societal picture I don't support people benefiting from things like intermodal shipping, goods distribution, and information services that they refuse to host. So I perceive a certain hypocrisy in this story.
Re: Microsoft pulls plug on plans for 244-acre data center in Caledonia (2025)
#28Re: Microsoft pulls plug on plans for 244-acre data center in Caledonia (2025)
#29Well my IP (regular plain residential Asian ISP) is blocked on this site. Zealous Cloudflare-blocking is breaking the web. (also thanks for the useful message telling me to "contact the website owner... while blocking me from the website where the contact info should be)
Re: Microsoft pulls plug on plans for 244-acre data center in Caledonia (2025)
#30[dead]