First tunnel element of the Fehmarnbelt Tunnel immersed
1–10 of 102 posts
Re: First tunnel element of the Fehmarnbelt Tunnel immersed
#2Re: First tunnel element of the Fehmarnbelt Tunnel immersed
#38B USD for 11 miles
CACHSR IOS 36B USD for 171 miles.
The Merced to Bakersfield IOS looks like a bargain on a distance basis. I have no idea of the carbon offset or passenger time saving versus flying of course
Re: First tunnel element of the Fehmarnbelt Tunnel immersed
#4Re: First tunnel element of the Fehmarnbelt Tunnel immersed
#552.6B krone for 18 km 8B USD for 11 miles CACHSR IOS 36B USD for 171 miles. The Merced to Bakersfield IOS looks like a bargain on a distance basis. I have no idea of the carbon offset or passenger time saving versus flying of course
https://www.latimes.com/california/story/2026-05-07/los-ange...
Re: First tunnel element of the Fehmarnbelt Tunnel immersed
#652.6B krone for 18 km 8B USD for 11 miles CACHSR IOS 36B USD for 171 miles. The Merced to Bakersfield IOS looks like a bargain on a distance basis. I have no idea of the carbon offset or passenger time saving versus flying of course
Re: First tunnel element of the Fehmarnbelt Tunnel immersed
#7I'm amazed that engineers can make submerged tunnels work and that leaks don't (literally) sink the whole plan.
Fehmarnbelt tunnel sections are concrete. I couldn't find how they are connected by concrete would make sense.
Re: First tunnel element of the Fehmarnbelt Tunnel immersed
#8I'm amazed that engineers can make submerged tunnels work and that leaks don't (literally) sink the whole plan.
The Transbay Tube carrying BART across the bay is immersed tube. The sections were welded together by divers. The sections were filled with water and then pumped out. Fehmarnbelt tunnel sections are concrete. I couldn't find how they are connected by concrete would make sense.
I'm curious what the lifetime of those gaskets might be and how you might maintain them.
Re: First tunnel element of the Fehmarnbelt Tunnel immersed
#9Earlier quoted context omitted.
The Transbay Tube carrying BART across the bay is immersed tube. The sections were welded together by divers. The sections were filled with water and then pumped out. Fehmarnbelt tunnel sections are concrete. I couldn't find how they are connected by concrete would make sense.
A video posted in another thread says the segments are sealed with bulkheads, floated into position, submerged by allowing water into a ballast section, dropped into place , aligned with pins, drawn to the next segment with hydraulic jacks, and sealed to it with rubber gaskets. Then the bulkheads can be removed. The gaskets also allow for some thermal expansion. I'm curious what the lifetime of those gaskets might be…
Re: First tunnel element of the Fehmarnbelt Tunnel immersed
#10Earlier quoted context omitted.
A video posted in another thread says the segments are sealed with bulkheads, floated into position, submerged by allowing water into a ballast section, dropped into place , aligned with pins, drawn to the next segment with hydraulic jacks, and sealed to it with rubber gaskets. Then the bulkheads can be removed. The gaskets also allow for some thermal expansion. I'm curious what the lifetime of those gaskets might be…
I figure once you join them, you could also apply waterproofing to the outside as well, no?