Live data from Hacker News

Court orders restart of all US offshore wind power construction

arstechnica.com

1–10 of 446 posts

Re: Court orders restart of all US offshore wind power construction

#2
posted this at ars forum: (it should be clear I think it was a stupid move by the WH, but I am trying to think what might have "informed" it)

Steelmanning the risks, its the link to mainland as a weakness in supply chain of power, compared to onshore sources possibly. But, the construction is in close water, well inside the exclusive economic zone. You would think passage of a craft capable of causing a power shock with an anchor chain was raising hackles well before this, because it's hugely unusual for a warcraft of another nation to be that close without an explicit permit. Under the Jones act, all inshore commercial craft delivering goods to and from named ports have to be US badged, for international shipping it's clear from the baltic there's a concrete risk, but that's a matter of policing the boats, not banning the structures at risk.

A second steelman might be some belief about the intermittency. Thats easily knocked over because the system as a whole is building out storage and continuity systems, is adapting to a mix of technology with different power availability throughout the day, and of all the sources of power, wind is one of the most easily predicted to a useful window forward. You know roughly when a dunkelflaut is expected inside 48h, if you don't know exactly when, or for how long. Thats well north of the spin-up time for alternative (dirty) sources of power, if your storage capacity isn't there yet to handle it.

Re: Court orders restart of all US offshore wind power construction

#3
post #2

posted this at ars forum: (it should be clear I think it was a stupid move by the WH, but I am trying to think what might have "informed" it) Steelmanning the risks, its the link to mainland as a weakness in supply chain of power, compared to onshore sources possibly. But, the construction is in close water, well inside the exclusive economic zone. You would think passage of a craft capable of causing a power shock w…

I appreciate the sentiment behind steelmanning but Trump has had over a decade of publicaly, vocally hating windmills because some were built too close to his golf course. See https://www.npr.org/2013/07/01/196352470/thar-he-blows-trump...

Its completely in-line with his personality to hold onto personal grievances for decades to the point that they become policy.

Re: Court orders restart of all US offshore wind power construction

#4
post #2

posted this at ars forum: (it should be clear I think it was a stupid move by the WH, but I am trying to think what might have "informed" it) Steelmanning the risks, its the link to mainland as a weakness in supply chain of power, compared to onshore sources possibly. But, the construction is in close water, well inside the exclusive economic zone. You would think passage of a craft capable of causing a power shock w…

Treating offshore wind like ports and pipelines from a security POV makes sense, it's exactly what we do with offshore O&G. The rub is that securing offshore wind installations is an order of magnitude more resource-intensive than securing a deepwater rig, bc you're talking about a perimeter than spans 100's of square miles, not a single platform with a limited # of risers

Re: Court orders restart of all US offshore wind power construction

#5
post #2

posted this at ars forum: (it should be clear I think it was a stupid move by the WH, but I am trying to think what might have "informed" it) Steelmanning the risks, its the link to mainland as a weakness in supply chain of power, compared to onshore sources possibly. But, the construction is in close water, well inside the exclusive economic zone. You would think passage of a craft capable of causing a power shock w…

Treating offshore wind like ports and pipelines from a security POV makes sense, it's exactly what we do with offshore O&G. The rub is that securing offshore wind installations is an order of magnitude more resource-intensive than securing a deepwater rig, bc you're talking about a perimeter than spans 100's of square miles, not a single platform with a limited # of risers

If you wanted to defend an O&G field, wouldn't you need to consider a similar extent? per wellhead, yes. but the go to a concentrator for onshore feed don't they? or some kind of attached floating rig, which itself is a SPF.

I thought fields had 100s of square km of extent too. The exclusion zone after nordstream is now pretty big, albiet "temporary" according to the web its 5 to 7 nm so 9 to 13 km so close to 100 km^2

Re: Court orders restart of all US offshore wind power construction

#6
post #2

posted this at ars forum: (it should be clear I think it was a stupid move by the WH, but I am trying to think what might have "informed" it) Steelmanning the risks, its the link to mainland as a weakness in supply chain of power, compared to onshore sources possibly. But, the construction is in close water, well inside the exclusive economic zone. You would think passage of a craft capable of causing a power shock w…

Treating offshore wind like ports and pipelines from a security POV makes sense, it's exactly what we do with offshore O&G. The rub is that securing offshore wind installations is an order of magnitude more resource-intensive than securing a deepwater rig, bc you're talking about a perimeter than spans 100's of square miles, not a single platform with a limited # of risers

From an attack PoV that's hundreds of square miles to destroy or disable many structures Vs taking out a single target.

ie. They can nibble a bit at an array before you're onto them Vs everything gets thrown at a point source target.

Re: Court orders restart of all US offshore wind power construction

#7
post #3
post #2

posted this at ars forum: (it should be clear I think it was a stupid move by the WH, but I am trying to think what might have "informed" it) Steelmanning the risks, its the link to mainland as a weakness in supply chain of power, compared to onshore sources possibly. But, the construction is in close water, well inside the exclusive economic zone. You would think passage of a craft capable of causing a power shock w…

I appreciate the sentiment behind steelmanning but Trump has had over a decade of publicaly, vocally hating windmills because some were built too close to his golf course. See https://www.npr.org/2013/07/01/196352470/thar-he-blows-trump... Its completely in-line with his personality to hold onto personal grievances for decades to the point that they become policy.

The Judges appear to have responded to something specific. If it was made-up, they would have thrown the case out harder and sanctioned whoever submitted false evidence. So I assume somebody with an ability to legally bind intel into the right form was persuaded to say something.

Re: Court orders restart of all US offshore wind power construction

#8
post #2

posted this at ars forum: (it should be clear I think it was a stupid move by the WH, but I am trying to think what might have "informed" it) Steelmanning the risks, its the link to mainland as a weakness in supply chain of power, compared to onshore sources possibly. But, the construction is in close water, well inside the exclusive economic zone. You would think passage of a craft capable of causing a power shock w…

US wind farms are 30 miles from the coast at most? No country is attacking that under some plausible deniability and it not being seen as an act of war.There are more important power lines further from civilisation running through rural areas in the US. These are not fiber cables a 1000 miles from the coast.

Gas generators can be spun up to provide megawatts in seconds btw. With less than a quarter of the grid being renewable, intermittency is not an issue. Grids are built with resilience in mind (or at least should be...).

Re: Court orders restart of all US offshore wind power construction

#9
In the 70s the oil companies were furious that Venezuela (if my understanding is correct) revoked their leases and forced them to abandon their equipment investments.

That's basically what the administration was trying to do here, under a legal system which (unlike Venezuela in the 70s) is very keen on protecting corporate investment. It seems like a classic "takings" case.

Re: Court orders restart of all US offshore wind power construction

#10
post #3
post #2

posted this at ars forum: (it should be clear I think it was a stupid move by the WH, but I am trying to think what might have "informed" it) Steelmanning the risks, its the link to mainland as a weakness in supply chain of power, compared to onshore sources possibly. But, the construction is in close water, well inside the exclusive economic zone. You would think passage of a craft capable of causing a power shock w…

I appreciate the sentiment behind steelmanning but Trump has had over a decade of publicaly, vocally hating windmills because some were built too close to his golf course. See https://www.npr.org/2013/07/01/196352470/thar-he-blows-trump... Its completely in-line with his personality to hold onto personal grievances for decades to the point that they become policy.

This is very much a root cause.

Not just the fact that Scottish wind farms prevailed, also that he was relentlessly mocked, ridiculed, and protested against in unavoidably visible ways by the Scots.

https://www.youtube.com/watch?v=-NNWmZwObZc

( Note: while a recent youtube clip, the anti Trump protests in Scotland date back to well before his campaign for his first term as POTUS )

Post reply on HN