Quote: As we just reported, the report says that according to data from the flight recorder both the fuel control switches, which are normally used to switch the engines on or off when on the ground, were moved from the run to the cutoff position shortly after takeoff. This caused both engines to lose thrust. The preliminary report suggests this is pilot error.
Preliminary report into Air India crash released
41–50 of 924 posts
Re: Preliminary report into Air India crash released
#42Re: Preliminary report into Air India crash released
#43> The aircraft achieved the maximum recorded airspeed of 180 Knots IAS at about 08:08:42 UTC and immediately thereafter, the Engine 1 and Engine 2 fuel cutoff switches transitioned from RUN to CUTOFF position one after another with a time gap of 01 sec. The Engine N1 and N2 began to decrease from their take-off values as the fuel supply to the engines was cut off. So the fuel supply was cut off intentionally. The swi…
https://ad.easa.europa.eu/ad/NM-18-33 well hold your horses there... from the FAA in their 2019 report linked above: > The Boeing Company (Boeing) received reports from operators of Model 737 airplanes that the fuel control switches were installed with the locking feature disengaged. The fuel control switches (or engine start switches) are installed on the control stand in the flight deck and used by the pilot to sup…
Re: Preliminary report into Air India crash released
#44Earlier quoted context omitted.
The affected table includes these models as well: 787-8, -9, and -10
The only affected models were 737s with the 766AT613-3D fuel control switch. The bulletin recommended that other models be inspected and any defects reported. It's unclear if any 787s were discovered to have the issue. Also the preliminary report mentions that the switches were replaced in 2019 and 2023, after the 2018 bulletin.
Re: Preliminary report into Air India crash released
#45> The aircraft achieved the maximum recorded airspeed of 180 Knots IAS at about 08:08:42 UTC and immediately thereafter, the Engine 1 and Engine 2 fuel cutoff switches transitioned from RUN to CUTOFF position one after another with a time gap of 01 sec. The Engine N1 and N2 began to decrease from their take-off values as the fuel supply to the engines was cut off. So the fuel supply was cut off intentionally. The swi…
https://ad.easa.europa.eu/ad/NM-18-33 well hold your horses there... from the FAA in their 2019 report linked above: > The Boeing Company (Boeing) received reports from operators of Model 737 airplanes that the fuel control switches were installed with the locking feature disengaged. The fuel control switches (or engine start switches) are installed on the control stand in the flight deck and used by the pilot to sup…
Re: Preliminary report into Air India crash released
#46> The aircraft achieved the maximum recorded airspeed of 180 Knots IAS at about 08:08:42 UTC and immediately thereafter, the Engine 1 and Engine 2 fuel cutoff switches transitioned from RUN to CUTOFF position one after another with a time gap of 01 sec. The Engine N1 and N2 began to decrease from their take-off values as the fuel supply to the engines was cut off. So the fuel supply was cut off intentionally. The swi…
This sounds to me like an electronics issue - an intermittent, inadvertent state transition likely due to some PCB component malfunction
Re: Preliminary report into Air India crash released
#47Re: Preliminary report into Air India crash released
#48Earlier quoted context omitted.
Report says the switches went to cutoff one second apart from each other. Can a human do the physical operation on two switches that quickly?
There's a good photo of them here; https://theaircurrent.com/aviation-safety/ai171-investigatio... You can do them both with one hand.
Re: Preliminary report into Air India crash released
#49> The aircraft achieved the maximum recorded airspeed of 180 Knots IAS at about 08:08:42 UTC and immediately thereafter, the Engine 1 and Engine 2 fuel cutoff switches transitioned from RUN to CUTOFF position one after another with a time gap of 01 sec. The Engine N1 and N2 began to decrease from their take-off values as the fuel supply to the engines was cut off. So the fuel supply was cut off intentionally. The swi…
Re: Preliminary report into Air India crash released
#50> The aircraft achieved the maximum recorded airspeed of 180 Knots IAS at about 08:08:42 UTC and immediately thereafter, the Engine 1 and Engine 2 fuel cutoff switches transitioned from RUN to CUTOFF position one after another with a time gap of 01 sec. The Engine N1 and N2 began to decrease from their take-off values as the fuel supply to the engines was cut off. So the fuel supply was cut off intentionally. The swi…
https://ad.easa.europa.eu/ad/NM-18-33 well hold your horses there... from the FAA in their 2019 report linked above: > The Boeing Company (Boeing) received reports from operators of Model 737 airplanes that the fuel control switches were installed with the locking feature disengaged. The fuel control switches (or engine start switches) are installed on the control stand in the flight deck and used by the pilot to sup…
Both of these extremely-experienced pilots say that there was near zero chance that the fuel switches were unintentionally moved. They were switched off within one second of each other, which rules out most failure scenarios.
If it was an issue with the switches, we also would have seen an air worthiness directive being issued. But they didn’t, because this was a mass murder.