Earlier quoted context omitted.
Spain is part of the largest interconnected grid in the world: https://en.wikipedia.org/wiki/Continental_Europe_Synchronous... Does this really qualify as "black start" when they can rely on the bigger EU grid?
Presumably not > A black start is the process of restoring an electric power station, a part of an electric grid or an industrial plant, to operation without relying on the external electric power transmission network to recover from a total or partial shutdown.[1] https://en.wikipedia.org/wiki/Black_start
Only the first power plant in a black-start (like a hydroelectric dam or gas plant started by a backup generator) is truly "black started." The rest don't fit that definition because they depend on an external power source to spin up and synchronize frequency before burning fuel and supplying any energy to the grid. If they didn't, the second they'd turn on they'd experience catastrophic unscheduled disassembly of the (very big) turbines.
Only the first power plant can come online without the external transmission network.