For perspective 2.7B is 0.04% of the entire US budget for 2024. This is a rocket that goes to the moon. If your reaction is "lord help us" then perhaps space exploration just isn't in your blood.
NASA's SLS rocket's Mobile Launcher-2 increase from $383M to $2.7B
11–20 of 78 posts
Re: NASA's SLS rocket's Mobile Launcher-2 increase from $383M to $2.7B
#12Say what we will about Elon, but him gambling his PayPal fortune was the best thing that happened to the US space program (and the global space race as whole!)
Re: NASA's SLS rocket's Mobile Launcher-2 increase from $383M to $2.7B
#13For perspective 2.7B is 0.04% of the entire US budget for 2024. This is a rocket that goes to the moon. If your reaction is "lord help us" then perhaps space exploration just isn't in your blood.
It's not for the rocket. A moon rocket for 2.7B would be a steal. This is just for a mostly static steel tower (on a mobile carrier?) that holds the rocket up and provides some piping etc to the rocket before launch. The mobile carrier is not included in the price AFAIK, but not sure.
It is carried around by one of the two existing crawler-transporters, which moves it between the VAB where the rocket is built and the launch pad.
Re: NASA's SLS rocket's Mobile Launcher-2 increase from $383M to $2.7B
#14For perspective 2.7B is 0.04% of the entire US budget for 2024. This is a rocket that goes to the moon. If your reaction is "lord help us" then perhaps space exploration just isn't in your blood.
Re: NASA's SLS rocket's Mobile Launcher-2 increase from $383M to $2.7B
#15How is it that government contractors can't build this thing on even a 9-year engineering schedule (July 2019–September 2028) when SpaceX is iterating almost exactly the same thing, on a timescale of months? They've already launched 4 SLS-sized vehicles, and have very visibly been redesigning the ground-support equipment each time around. The next launch for instance (next month!) debuts mechanical arms attached to t…
Re: NASA's SLS rocket's Mobile Launcher-2 increase from $383M to $2.7B
#16For perspective 2.7B is 0.04% of the entire US budget for 2024. This is a rocket that goes to the moon. If your reaction is "lord help us" then perhaps space exploration just isn't in your blood.
Re: NASA's SLS rocket's Mobile Launcher-2 increase from $383M to $2.7B
#17For perspective 2.7B is 0.04% of the entire US budget for 2024. This is a rocket that goes to the moon. If your reaction is "lord help us" then perhaps space exploration just isn't in your blood.
This isn't for the rocket, just the structure that it's connected to before launch. Tens of billions of dollars have already been wasted on the rocket. I say "wasted" because it's already essentially obsoleted by the Falcon Heavy which has been ready to go for years, is reliable, and launches at a tiny fraction of the cost. And by the time Starship comes into play you're talking about a Ford Pinto being sold at Lambo…
The current SLS can send about 27,000kg to TLI, and block 2 is expected to send between 43,000kg and 47,000kg to TLI.
Could the Falcon Heavy be used on a multi-part moon mission? No doubt, but it's not in the same weight class as SLS.
Re: NASA's SLS rocket's Mobile Launcher-2 increase from $383M to $2.7B
#18Earlier quoted context omitted.
It's not for the rocket. A moon rocket for 2.7B would be a steal. This is just for a mostly static steel tower (on a mobile carrier?) that holds the rocket up and provides some piping etc to the rocket before launch. The mobile carrier is not included in the price AFAIK, but not sure.
It's tower on a large steel platform but it also includes significant GSE (ground support equipment) - cabling and cryogenic plumbing to connect to the rocket to let it be fueled and readied for launch, all connected via mechanical arms to pull the quick disconnects away from the rocket, in some cases into armored boxes to protect against the rocket exhaust. Plus a crew access arm to let astronauts board, elevators s…
Re: NASA's SLS rocket's Mobile Launcher-2 increase from $383M to $2.7B
#19How is it that government contractors can't build this thing on even a 9-year engineering schedule (July 2019–September 2028) when SpaceX is iterating almost exactly the same thing, on a timescale of months? They've already launched 4 SLS-sized vehicles, and have very visibly been redesigning the ground-support equipment each time around. The next launch for instance (next month!) debuts mechanical arms attached to t…
fun fact...its part of the legal boilerplate astronauts sign...
Re: NASA's SLS rocket's Mobile Launcher-2 increase from $383M to $2.7B
#20And it will be 3 years late! I honestly would love to know how much money is 'wasted' by NASA because of these companies that seem to, over promise and then need a lot more money. And I don't say wasted because I think that the money spent at NASA is not worthwhile. But how much else could be done if that money could be spent elsewhere or at the very least be properly estimated in the beginning so it could have been…