Earlier quoted context omitted.
> For example, last week the blog pointed out that the new trains take an extra 8-10 seconds after stopping at a station to begin opening the doors Anecdotally, this is also true of the San Francisco Municipal subway. The subway cars take a long time to open and close doors because there is a mechanical bridge that closes the gap between the train and the platform. This is also a pretty big time sink for the subway s…
In contrast, in the metro in Paris, the doors open a few seconds before the train stops, so that the doors are fully open by the time the train is stopped - and passengers in a hurry can jump out while the train is still moving.
Caltrain's new electric trains
41–50 of 140 posts
Re: Caltrain's new electric trains
#42As a European, this article is outright bizarre, and makes me appreciate what we have much more. I will complain less about trains from now on.
> makes me appreciate what we have much more. I will complain less about trains from now on European trains are lovely. But coming from New York, where our regional rail runs with Swiss on-timeness, the tolerance for delays in the U.K. and Germany is wild.
Re: Caltrain's new electric trains
#43Anyone interested in Caltrain operation should check out the Caltrain HSR blog, https://caltrain-hsr.blogspot.com/ . It's not just about high-speed rail. For example, last week the blog pointed out that the new trains take an extra 8-10 seconds after stopping at a station to begin opening the doors. Which chews up 12% of the trip time savings achieved by the move from diesel to electrified trains!
> For example, last week the blog pointed out that the new trains take an extra 8-10 seconds after stopping at a station to begin opening the doors Anecdotally, this is also true of the San Francisco Municipal subway. The subway cars take a long time to open and close doors because there is a mechanical bridge that closes the gap between the train and the platform. This is also a pretty big time sink for the subway s…
Re: Caltrain's new electric trains
#44Earlier quoted context omitted.
> For example, last week the blog pointed out that the new trains take an extra 8-10 seconds after stopping at a station to begin opening the doors Anecdotally, this is also true of the San Francisco Municipal subway. The subway cars take a long time to open and close doors because there is a mechanical bridge that closes the gap between the train and the platform. This is also a pretty big time sink for the subway s…
In contrast, in the metro in Paris, the doors open a few seconds before the train stops, so that the doors are fully open by the time the train is stopped - and passengers in a hurry can jump out while the train is still moving.
Re: Caltrain's new electric trains
#45I took a pretty nice photo of the new Caltrain using a line scan camera [1]. [1] https://i.dllu.net/caltrain317_4c6c80561b5156c3.jpg (6878 x 2048)
Re: Caltrain's new electric trains
#46That's a dream. I know. But I do recall Amtrak saying something about making the existing tracks capable of >80mph between Portland and Seattle, and the Talgo trainsets they have now are rated for 120mph IIRC. So maybe we'll get something that doesn't suck.
Re: Caltrain's new electric trains
#47What fuel is used to generate the electricity? (Honest question since I have no idea how electricity markets work)
> Caltrain […] was the first service to convert from diesel to electric in the West. (A handful of other passenger trains in the country run on electricity, including an Amtrak line in the Northeast.)
This is so misleading that I wonder if the author did any research at all. There were too many electric interurbans to even list here, but even if you try to narrow it to heavy main lines it was not the first by any possible interpretation: https://en.wikipedia.org/wiki/Category:Electric_railways_in_...
The saddest electric-mainline loss in Caltrain's territory is the old Sacramento Northern, part of which forms the Western Railway Museum trackage:
https://www.abandonedrails.com/sacramento-northern-railroad
https://en.wikipedia.org/wiki/Sacramento_Northern_Railway
https://old.reddit.com/r/rustyrails/comments/vij28p/route_of...
Re: Caltrain's new electric trains
#48Anyone interested in Caltrain operation should check out the Caltrain HSR blog, https://caltrain-hsr.blogspot.com/ . It's not just about high-speed rail. For example, last week the blog pointed out that the new trains take an extra 8-10 seconds after stopping at a station to begin opening the doors. Which chews up 12% of the trip time savings achieved by the move from diesel to electrified trains!
> As seen in the timeline graphic, allowing the step to deploy and retract while the train is in motion would remove this wasted dwell time. It's interesting... I wonder if extending the step while the train is in motion has the potential to knock people down who's currently on the platform and standing too close to the train. > since the step itself does not extend over the platform (it reaches only 63.5 inches from…
The old trains have no moving steps.
Re: Caltrain's new electric trains
#49I was just looking at Caltrain routes yesterday wondering how there’s a route from Sunnyvale to SF that takes over 2 hours. Driving (at times) should be about 45 minutes. Didn’t make sense to me.
Re: Caltrain's new electric trains
#50I live 300 Meters from a Station. IT IS SO MUCH QUIETER!