Live data from Hacker News

Boeing withdraws bid for safety exemption for Boeing 737 MAX 7

reuters.com

111–120 of 173 posts

Re: Boeing withdraws bid for safety exemption for Boeing 737 MAX 7

#111
post #87

Earlier quoted context omitted.

Why is it troublesome? As someone with very limited knowledge in aircraft development, I'm genuinely curious about what more modern designs would bring to the table compared to the modern 737s, which I assume are heavily updated versions of the original 1960s design?

Engines got a lot larger over time, more fuel efficient, more reliable, etc. On a 737 those engines cannot be placed in an ideal position, because that would mean they'd clip into the ground. The engines are being put above and I think in front of (might be wrong there) where they should be for maximal flight stability. The original 737 was self-correcting - meaning that if for example the aircraft stalled, the resul…

ELI5! thanks so much!

so the crashes were because the new software was confusing to the pilots and did something unintuitive? and now they want to do another change to how the airplane behaves (interacts with) the pilot?

Re: Boeing withdraws bid for safety exemption for Boeing 737 MAX 7

#112

Earlier quoted context omitted.

The DeHavilland Comet was the first practical civil jet airliner ever produced. It literally invented the systems that were onboard. The 737 is a 60 year old design with a stellar safety record up to this point. It's not comparable at all. The only reason those planes fell apart is rotten management.

You're off your rocker. Comet's square windows were fundamentally unsound. 737 NG contains Ducommun garbage structural components deemed "airworthy", going back between 1996 and 2004. 737 Classic != NG != MAX. No amount of MCAS or engineering exceptions will make it so, or make it safe.

The Comet 4 didn't _have_ those, tho (its windows were round, precisely because of the incorrect perception that the Comet 1's window shape was problematic).

Re: Boeing withdraws bid for safety exemption for Boeing 737 MAX 7

#113
post #86
post #7

> Boeing said late on Monday "while we are confident that the proposed time-limited exemption for that system follows established FAA processes to ensure safe operation, we will instead incorporate an engineering solution that will be completed during the certification process." Anybody else get the exact opposite of a warm fuzzy feeling about the specific wording choice used by Boeing there?

Whether Boeing has confidence no longer matters, what matters is whether we have confidence and the answer is NOOOOOOOOOOO.

[deleted]

Re: Boeing withdraws bid for safety exemption for Boeing 737 MAX 7

#114
post #74
post #65

Earlier quoted context omitted.

> It was designed for 60s-style boarding via air-stairs on the ground (rather than modern jetways from the terminal) Note that boarding a plane in the middle of the tarmac via bus+stairs is still quite common at many major European airports. Using jet bridges exclusively requires the planes to all be parked in one long line beside a building, which can never be as space-efficient as a 2D-grid parking lot.

Isn't that mostly through mobile stairs though? Airstairs are specifically the foldable stairs built into the plane, which enforce a stricter limit on the height that the door can be from the ground. I'm sure Ryanair uses them to save on ground handling fees, but if you were designing a plane from scratch these days you wouldn't include them.

There actually are A320s with integrated airstairs, though it isn't as common as it is for 737s.

Re: Boeing withdraws bid for safety exemption for Boeing 737 MAX 7

#115
post #106

Earlier quoted context omitted.

...mm... but they didnt say "we have updated our plan and will now focus on an engineered solution". That's not even a paraphrase of what they said. They said: > we are confident that the proposed time-limited exemption for that system follows established FAA processes When we know that: 1) The established FAA processes resulted in a variation of this aircraft that crashed. 2) The established FAA processes resulted i…

> while we are confident that the proposed time-limited exemption for that system follows established FAA processes to ensure safe operation, we will instead incorporate an engineering solution that will be completed during the certification process. Emphasis mine. Boeing literally said they won’t seek an exemption and will instead engineer a solution.

Saying we’re going to focus on X is different from saying well half ass X.

“we are confident”

It they don’t think it’s necessary that means they don’t think it’s important or needs to be executed well.

Re: Boeing withdraws bid for safety exemption for Boeing 737 MAX 7

#116
post #115
post #106

Earlier quoted context omitted.

> while we are confident that the proposed time-limited exemption for that system follows established FAA processes to ensure safe operation, we will instead incorporate an engineering solution that will be completed during the certification process. Emphasis mine. Boeing literally said they won’t seek an exemption and will instead engineer a solution.

Saying we’re going to focus on X is different from saying well half ass X. “we are confident” It they don’t think it’s necessary that means they don’t think it’s important or needs to be executed well.

If you read the full sentence Boeing says they don’t believe existing regulations require an engineered solution but Boeing is pursuing one anyway. Since Boeing doesn’t believe this is required by regulations it suggests to me Boeing believes it is necessary for safe operation. If anything this reads to me like Boeing saying the regulations are too permissive. In other words Boeing isn’t trying to cheat this time.

Re: Boeing withdraws bid for safety exemption for Boeing 737 MAX 7

#118
Ryanair is happy to buy the Boeing 737-MAX planes that other airlines are thinking of ditching: https://skift.com/2024/01/29/ryanair-ceo-says-uniteds-boeing...

Interestingly, Airbus's orders are filled up to 2030. I suppose if an airline wants something sooner, they'll either get Boeing or they're not going [to get one].

Re: Boeing withdraws bid for safety exemption for Boeing 737 MAX 7

#119

Earlier quoted context omitted.

The DeHavilland Comet was the first practical civil jet airliner ever produced. It literally invented the systems that were onboard. The 737 is a 60 year old design with a stellar safety record up to this point. It's not comparable at all. The only reason those planes fell apart is rotten management.

> The 737 is a 60 year old design with a stellar safety record It isn't. Or at least the max isn't. It's a big change from the original 737, a change that makes the type IMHO unairworthy beyond repair. But that is not even the biggest issue, its the fact that boeing thinks they should withold essential information (such as the existence of an MCAS) from the pilots, who ultimaltely bear the responsibility of the safet…

It was pressure from airlines to not have to retrain pilots, because that costs them money and whatnot. And in almost all cases when it comes to Boeing, the 737, and further issues, these airlines are also involved.

Re: Boeing withdraws bid for safety exemption for Boeing 737 MAX 7

#120

Earlier quoted context omitted.

What I don't understand is why the 737-Max 7 is having problems with the anti-icing system for the engines. What "improvements" did they make to the engines that turned it into a problem?

Cowlings are now composite (ie plastic) instead of aluminum. They are limited to 5 minutes of use in dry air to prevent the cowling from melting, flying apart, or getting into the engine and causing it to fly apart.

I'm curious how much it was saved in money and/or weight that it made sense to someone to make the cowling out of "plastic" :)

Sometimes it feels like the decision process at Boeing is:

- How big of a problem $this can be?

- Disaster like

- Go for it.

Post reply on HN