I added up all of the time we were spending in Scrum-related activities at a recent job. The company hired a lot of project and program managers who were pulling everyone into everyone meeting. I presented the number of hours (meetings multiplied by engineering participants) to our VP and he insisted I must be wrong. He insisted there was no possible way we could be spending that much time doing Scrum things and that…
Occasionally our Scrum Master will put an actual scrum meeting on the calendar, but then talks about whatever he wants, and it never moves the ball forward from an organizational point of view. A retrospective would go a long way; we’ve never had one of those. I bring that up often, as the 1 meeting we should have, if we only have 1 meeting.
I tracked my time meticulously for several years, and when I used it to point out how horrible the current environment is, I was told I was doing too much and should be much my lazy about the tracking, to the point where it becomes meaningless.