Live data from Hacker News

UK announces commercial operations of longest land/subsea interconnector

nationalgrid.com

141–142 of 142 posts

Re: UK announces commercial operations of longest land/subsea interconnector

#141
post #94
post #58

Lots of fun facts on the Wikipedia page: https://en.wikipedia.org/wiki/Viking_Link > Annual transmission capacity of 12.3 TWh. > The actual cable is made of copper, steel, paper and plastic and weighs about 40 kg per meter. > It is similar in capacity and length to the UK–Norway North Sea Link.

> weighs about 40 kg per meter For reference, a human child weighs about 15 kg per meter. But since humans grow in 3 dimensions, a healthy adult human will be around 40–45 kg per meter, similar to the cable. In our current overweight society, realistic adult humans are of course heavier.

What’s the cost difference in using people vs cable? If we make the assumption that people can be bought at insurance rates and have equal capacity to a cable.

Re: UK announces commercial operations of longest land/subsea interconnector

#142

Earlier quoted context omitted.

Regulation and tax are big ones. The ElecLink UK/France interconnector was significantly delayed due to disagreements in how it should be regulated and taxed. Similarly, things like the EU Carbon Border Adjustment mechanism have the potential to make it unprofitable to import electricity into the EU without affecting exports (because even significant price discrepancies would be swallowed up by the additional carbon…

I think we've agreed to align with the EU on carbon tax: https://www.gov.uk/government/news/new-uk-levy-to-level-carb...

Yes. My understanding is that this depends on the eventual form of the UK carbon border tax though.
Post reply on HN