This may be one of the best (worst) examples of how bad things are today. The California High-Speed Rail was funded over 15 years ago and they haven't begun building it yet. They are 82% of the way through their environmental studies. https://hsr.ca.gov/about/capital-costs-funding/ https://twitter.com/cahsra/status/1674900759677227012
- The Cedar Viaduct, a 3,700-foot-long bridge over State Route 99 in Fresno, which features a signature double arch design².
- The Hanford Viaduct, a 3,300-foot-long bridge over the Kings River and State Route 43 in Kings County, which is the longest structure in Construction Package 2-3²⁴.
- The San Joaquin River Viaduct, a 4,700-foot-long bridge over the San Joaquin River and North Avenue in Fresno County, which includes a pergola structure to allow future trains to cross over the existing BNSF Railway tracks²³.
- The Tuolumne Street Bridge, a two-way bridge that spans the Union Pacific Railroad tracks and future high-speed rail tracks in downtown Fresno²³.
- The Fresno Trench and State Route 180 Passageway, a two-mile-long trench that will carry high-speed trains under several streets in Fresno, including State Route 180²³.
[1] https://en.wikipedia.org/wiki/Construction_of_California_Hig....
[2] https://hsr.ca.gov/about/project-update-reports/2023-project....
[3] https://hsr.ca.gov/2023/05/11/video-release-high-speed-rail-....
[4] https://www.fresnobee.com/news/local/high-speed-rail/article...