Would love to hear fast how charging stations will scale in a way that beats the current price and speed of filling up a car with gasoline.
I mean, even in a small town with, say, three gas stations, there are peak times when all the spots are taken. Average fueling time is probably a few minutes.
How to switch that to an all-electric system?
+ build a significantly higher number of fast electric charges than there are gas pumps. But apparently fast charging stations are rather expensive to build, and that's reflected in prices-- they are higher than current gas prices. There's also the significant increase in the time to fuel the vehicle compared to gas, and that's not going to change any time soon.
+ ramp up at-home charging as well as "at-business" charging for things like landscapers/etc. who use a lot of vehicles. But if you do this at scale electricity costs go through the roof and you're back to the same pricing problem as above.
I'm just thinking of this in terms of a kind of soft-realtime system. You've got something like "blocks" of vehicles all of which need to be fueled on deadlines which can generally get met currently. If there's a massive switch to EV I don't see how those deadlines get met without an enormous increase in charging prices. And without massive subsidies there's no way to build the infrastructure needed to meet the deadlines.
(And let's just assume zero risk of a fast-charger monopoly or cartel...)