Bring a project to a stand still with the term -10x? The term itself doesn't make sense.
I know the article is generally just talking about bad engineers. However the topic I started here is more about the term 10x.
>And I have seen this multiple times. People who in one way or another managed to slow down other people. Toxic people can create such an environment that the productive people quit. They don't bring smaller value, not even zero value, they bring negative value to the team/project.
Sure but negative progress or -10x progress or 10x progress is just not realistic. The 10 in the term 10x is the thing that is arbitrary. Not only is it arbitrary it's completely unrealistic.
>I don't know where you come with this arbitrary interpretation of exactly -1, but yes, that happens to projects.
Arbitrary definition of 1x? 1x is default -1x would be the default but backwards. It's anything but arbitrary as it's the smallest whole number metric for negative performance. The 10 on 10x is again the arbitrary constant here. Why 10? is it because we have 10 fingers or use base 10 in our number system? 10 is Arbitrary.
Also, Losing knowledge and intelligence is the equivalent of brain damage so are people banging their heads against walls and shooting up on brain damaging drugs? Doubt it. Productivity stops at zero, negative progress is so rare it's basically non-existent, that is unless you think people are regularly suffering from brain damage.
People who use the term 10x or -10x as some kind of relatively accurate metric (like many in this thread are doing) aren't applying good intuition or statistical knowledge to the situation. 2x for really good engineers and 0x for really bad engineers are the more technically accurate term. I get the usage of 10x as purely an expression but that is Not what the topic of this thread as evolved into.