This article is highlighting a problem with badly designed maturity models in general. If you have a good maturity model (e.g. for DevOps one based on DORA metrics) then the capabilities needed to arrive at a higher level can be determined per-org. That solves the real problem. I think the article has a fundamental "AB problem" issue.
How do metrics like deployment frequency and lead time for changes can have an impact on "the capabilities needed" by an org?
Honestly, your comment reads a bit like machine learning generated buzzword bingo.