This number is based on existing mines (active and inactive) only. There's a lot more fissile material available than just the 40 Gg of usable fissile material. And that's assuming we only use U-235 and Pu-239. We also have viable LWR designs for Th-232 and are in the process of creating the first 5 Th-232 SMR test reactors at grid-scale right now.
> This number is based on existing mines (active and inactive) only. There's a lot more fissile material available than just the 40 Gg of usable fissile material. And that's assuming we only use U-235 and Pu-239. That's all known and inferred accessible reserves. Not current mines. There are about 8-10 million tonnes of natural Uranium which has 0.5% extractable U235 (a bit more if you're willing to pay 10x as much f…
So nuclear then? Plants take on average 1-year longer than natural gas plants and a single nuclear plant produces thousands of hectares worth of solar panels with a tiny fraction of the resource usage. We have viable and in-use grid-scale U-235, Pu-239, and Th-232 reactors. We also have viable and in-use military operated U-233 breeder reactors in multiple nations that are in active production. Converting from a military design to a grid-scale design isn't really that hard as you loosen a ton of the space and thermal management requirements making manufacturing, operation, and maintenance cheaper.
> So a technology that hasn't made it to the test bench
The technology is fully proven in test reactors. The first 5 grid-scale reactors being built in the USA are part of a US Department of Energy program looking to create shovel-ready Th-232 SMR designs. There isn't a shortage of any of the isotopes we'd need for nuclear. Even if we used only U-235 and Pu-239 reactors using existing reserves to replace all current and projected global energy needs, we'd have 79 years to find more fuel or build something else. Meanwhile, with solar and wind, we still haven't figure out how to cheaply and safely store the energy to smooth the power supply curve. We could buy ourselves over 79 years to figure this out by building nuclear with only existing grid-scale technologies starting today.