And a dry-run: "a Change Request ticket was created, which includes a dry-run of the change, as well as a stepped rollout procedure."
And a Peer review: "Before it was allowed to go out, it was also peer reviewed by multiple engineers. "
I would doubt the expertise of tech guys of cloudflare, reviewing the change. And there was a dry-run.
But is it really OK to apply the change to a spine network which would affect 50% network traffic? Just out of peer review and a dry run? No green/blue, no gray release, maybe these are not proper for a small change here. But this "small" change really got big affect. I thougt it was worth it.
And from my shallow experience, the dry-run would always have do nothing to the env. It is dry-run anyway.
And at last the three lines are found out. So I wonder how did this re-order happen? And why?
With these tiny changes, there should be some mechanism to verify their correctness, not just review and dry-run.