Totally unrelated question but does anyone know if nuclear powered US Navy vessels are able to feed power to the grid while in port? I know it's technically possible, just not sure if anyone has ever implemented such a thing.
Why are nuclear power construction costs so high?
11–20 of 512 posts
Re: Why are nuclear power construction costs so high?
#12TL;DR rising labor costs and regulation
Each build is unique and requires way too much overhead. The new generation of preapproved factory assembled SMR's are the future.
Re: Why are nuclear power construction costs so high?
#13This is how capitalism gives us scarcity when there is no reason for scarcity. Infrastructure like trains and nuclear that absolutely swamps current demand, and whose costs cannot be adjusted very much (even if one can run fewer trains, remove some fuel rods) is good. But woe unto anyone that floods the market utopia-style under capitalism --- you will just get paid nothing and your investors will not repeat such a project again.
Re: Why are nuclear power construction costs so high?
#14> Because nuclear plants are expensive, and they take a long time to build, financing their construction can also be a significant fraction of their cost, typically around 15-20% of the cost of the plant. For plants that have severe construction delays and/or have high financing costs (such as the Vogtle 3 and 4 plants in Georgia), this can be 50% of the cost or more. This is why nuclear power plants should be state-…
Re: Why are nuclear power construction costs so high?
#15Between the 60s and 80s, there were many nuclear reactors projects which allowed an industry to develop and get better at it.
But since the 80s, there was comparatively very few new reactors built for over 20-30 years. The workforce that had the skills and knowledge related to actually building nuclear plants had mostly retired and their replacement had only theoretical knowledge and no actual experience. This makes building new reactor much harder than it should be.
The embattled EPR project at Flammanville is an exemple of that: the specialised company that was hired to forge the nuclear vessel were simply unable to build to spec and a defective critical piece was delivered, creating delays and cost increases. In the end, they even had to use it anyway as it was not economically feasible to simply have another one made.
Re: Why are nuclear power construction costs so high?
#16Totally unrelated question but does anyone know if nuclear powered US Navy vessels are able to feed power to the grid while in port? I know it's technically possible, just not sure if anyone has ever implemented such a thing.
The largest nuclear vessel produces up to 160 MW, the smallest single nuclear reactor power plant about 500 MW (sites often have multiples), the largest nuclear reactor in the US is about 4 GW. An average wind turbine produces 2-3 MW.
> It is estimated that the total thermal power output of the A1B will be around 700 MW
CVN-78 has two of them.
Re: Why are nuclear power construction costs so high?
#17TL;DR rising labor costs and regulation
It's a general problem: HSR and subway stations have seen similar increases.
Re: Why are nuclear power construction costs so high?
#18Totally unrelated question but does anyone know if nuclear powered US Navy vessels are able to feed power to the grid while in port? I know it's technically possible, just not sure if anyone has ever implemented such a thing.
Re: Why are nuclear power construction costs so high?
#19They're doing so much good work with micro and modular reactors that can basically be "dropped in" decommissioned coal-burning sites because the infrastructure to tie into the electric grid already exists.
It was expressed to me that selling this idea to the private-sector energy industry was an uphill battle and uptake was very slow to nonexistent.
Re: Why are nuclear power construction costs so high?
#20> Because nuclear plants are expensive, and they take a long time to build, financing their construction can also be a significant fraction of their cost, typically around 15-20% of the cost of the plant. For plants that have severe construction delays and/or have high financing costs (such as the Vogtle 3 and 4 plants in Georgia), this can be 50% of the cost or more. This is why nuclear power plants should be state-…