Earlier quoted context omitted.
Are you stating that the guy nailing zip sheathing on the side of a house talks to the engineer who designed it?
My assumption: that the guy is even nailing ZIP sheathing is doing so because some engineer determined it was an improvement over previous construction techniques. (But maybe it is just cheaper.)
Better? No idea. Although there might be less to screw up unless someone cost-saves by not installing the spec tape (it really is necessary).