Live data from Hacker News

Finland starts much-delayed nuclear plant, brings respite to power market

reuters.com

251–260 of 632 posts

Re: Finland starts much-delayed nuclear plant, brings respite to power market

#251
post #94

Earlier quoted context omitted.

Here in Perth a good third or more of my electricity is keeping the house cool so some of that is going to average out. We don't have saunas but we do have hot water. There's going to be an obvious error of margin either side of my napkin calculations but I think the order of magnitude is in the ballpark.

Cooling a house is more energy efficient than warming one

Depends what your energy source for heat is.

Re: Finland starts much-delayed nuclear plant, brings respite to power market

#252

Earlier quoted context omitted.

It’s a question of temperature difference. Cooling a house from 40° to 20° uses approximately the same energy as heating it from 0° to 20°. But it gets much colder than 0° C in Finland, while it is very rare to have temperatures above 45° C anywhere in the world.

It's not just that. To make something colder using a heat pump, you must heat up something else by the equivalent amount. Actually more, because of losses. Whereas making something warmer can be done without a heat pump, by releasing stored chemical energy, at nearly no losses.

Ductless heat pumps are more efficient at heating than alternatives, but there's a floor on how low of an ambient temperature they can handle.

Re: Finland starts much-delayed nuclear plant, brings respite to power market

#253

Earlier quoted context omitted.

It’s not too distant a dream, the Rolls Royce small modular reactor designs have just been submitted for approval: https://www.newcivilengineer.com/latest/rolls-royce-submits-...

I'm betting they don't get approved.

Anyway not for longer than hoped. And, if approved, not built anytime soon, as the cost will still be much more than for renewable + storage, at that time. Those latter costs are falling faster than ever.

Re: Finland starts much-delayed nuclear plant, brings respite to power market

#254
post #228

Earlier quoted context omitted.

Outside of pumped hydro, storage is very expensive. Would need something like a 15x reduction in storage costs to be competitive with nuclear.

And where do you build that hydro? I hear some people suggesting Europe using the valleys in Sweden and Norway. Imagine the EU electricity grid at the mercy of one of Putin’s submarines. The rest of Europe doesn’t have many valleys left to flood.

Luckily Putin would never capture a nuclear plant.

Re: Finland starts much-delayed nuclear plant, brings respite to power market

#255

Earlier quoted context omitted.

Something like this. The project started in 2000, construction began in 2005 and should have been completed in 2010. Original cost was 3 billion euro but landed on over 10 billion euro. It is the first nuclear reactor in Europe for 15 years so not much working experience or available sub contractors. Apparently, China, South Korea, Japan and Russia can build at a third of the cost and time of that. If nuclear energy…

EDF (France) keeps building nuclear reactors around the world. Not sure whether they are the only EU company active in that market, but I doubt it. Either way, some expertise definitely exists in Europe. Germany had spectacular delays and overruns for a new airport for Berlin That too doesn't mean Europe forgot how to build airports.

This reactor was designed/partially built by Framatome/Areva/EDF/whatever the ownership structure is now after the various Areva scandals. Siemens erected the building. Same design as the Flamanville plant that's still not finished. Two reactors vessels shipped to China also from the same design. Time delays (took over 7 years to construct; original plan was 4), structural issues in the reactor containment vessel during manufacturing due to shoddy work by Areva and substandard alloy quality delivered by the Areva subsidiary.

This is also the nuclear plant (Taishan) that was in the news last year regarding damaged fuel rods.

That's the output from the experts in France so far.

Areva was basically shuttered and written off as a loss during all this. A part of the company only still exists as part of this Finland deal.

Re: Finland starts much-delayed nuclear plant, brings respite to power market

#256
post #96

Earlier quoted context omitted.

When an article starts with chernobyl as example of what mistakes we're likely to make when building a new plant today, it makes me itch to just close the tab and dismiss the opinion of the person who linked it. Not sure why I even bothered digging into it, but for example one later point is also misleading: "uranium resources will be depleted by the end of this century". I think I found the source (not that they lin…

> Accidents in nuclear power plants can have disastrous implications. As in the case if Chernobyl, large areas around the site remain unusable forever What exactly about this do you not buy? And what is your solution for storing nuclear waste safely for hundreds of thousands of years?

Technology -- there was a submission just today currently on the front page:

"Lasers could cut lifespan of nuclear waste from a million years to 30 minutes"

https://news.ycombinator.com/item?id=30652334

Obviously this particular idea is still blue-sky but as technology improves, I'd like to think we'll be able to solve problems like this within a few decades.

(although I'm still waiting for my Mr Fusion, Flying Car etc).

Re: Finland starts much-delayed nuclear plant, brings respite to power market

#257
post #238
post #149

Earlier quoted context omitted.

If only we could have both types of energy source. Cover the gaps in solar/wind with nuclear, cover the gaps in nuclear with solar/wind. Sprinkle a small amount of pumped hydro and battery storage on top and what a world it could be.

Nuclear can't be shut down / turned on on a short term basis, there is a lot of inertia. It might be a solution for seasonal issues only, but in Germany, there's usually wind during the no-sun season, and sun during the no-wind season.

Sun can be predicted. Not sure what the reaction time is and how far ahead we can reliably forecast wind, but even if there is zero response possible to wind fluctuations that still seems like a win. Afaik fuel is also not the biggest cost in nuclear so estimating on the high side might not be an issue (but this is admittedly where I veer into speculation).

Re: Finland starts much-delayed nuclear plant, brings respite to power market

#258
post #133

Earlier quoted context omitted.

What's depressing is that you'd need ten of these giant power plants to power Bitcoin mining. And by the time you finally got those ten $10B plants online, Bitcoin's energy use would have ballooned to some even more absurd number, assuming we do nothing to stop the current trajectory.

You'll need three times more to power all the standby devices in the US, and nobody is doing something as simple as to powering down their tv/console when they stop using it. People don't even unplug their chargers after their phone is charged.

> unplug their chargers after their phone is charged

To me, that’s a flaw of the charger if it keeps working when no device is connected.

As for TVs and others, we need to mandate a front-facing power switch, because most TVs/devices don’t have one anymore.

Re: Finland starts much-delayed nuclear plant, brings respite to power market

#259

Earlier quoted context omitted.

If those EVs are mainly charging at night, where does the extra peak load come from? Or is this just a case of not being able to shut off as much NG/Hydro generation at night (since nuclear can’t really be turned on and off at will)?

Electrification goes beyond cars. Think of how much fuel they need for heat in Finland. Electrification means replacing that fuel with electricity. And many reactors are able to modulate their output, either by absorbing neutrons to slow the chain reaction, or by letting steam bypass the turbines. https://www.energy.gov/ne/articles/3-ways-nuclear-more-flexi...

We (Finland) are probably not going to move towards electric heating to any significant degree. Currently direct (resistive) electric is already the most common means of heating in single-family homes and other low-density residential buildings. Heat pumps are fortunately becoming popular especially in new development, and with them a significant reduction of electricity use compared to direct electric.

For condos and apartment buildings by far the most common method of heating is district heating (teleheating) [1], and historically this has been very carbon intensive, even though cogeneration of both heat and electricity in one plant is quite efficient (efficiency > 80%; most Finnish thermal power plants are cogen). Fossil fuels and peat are being replaced with more sustainable (mostly wood-based) fuels, but attaining the emission goals requires burning less fuel, period, which means technologies like geothermal boreholes and large-scale heatpump facilities.

SMR nuclear reactors, if they ever become mainstream, would be an excellent source of clean heat and electricity for cities. Current nuclear power plants are located (by design) too far from cities for it to be economical to pipe their waste heat to where it's needed.

[1] https://en.wikipedia.org/wiki/District_heating

Re: Finland starts much-delayed nuclear plant, brings respite to power market

#260
post #254
post #228

Earlier quoted context omitted.

And where do you build that hydro? I hear some people suggesting Europe using the valleys in Sweden and Norway. Imagine the EU electricity grid at the mercy of one of Putin’s submarines. The rest of Europe doesn’t have many valleys left to flood.

Luckily Putin would never capture a nuclear plant.

He needs to pass through NATO forces and successfully prove the nuclear deterence wrong before you need to start worrying about that.
Post reply on HN