Earlier quoted context omitted.
The problem wasn't NASA. The problem was, NASA was told to build something impossible - a cheap and reliable spaceplane. It was many times more complex than anything else ever made (including the Saturn V). It was never going to be cheap and reliable. (Well, it might be possible today, with decades more experience and technology). Only the "yes men" said it was possible, and they got promoted. The rest of the enginee…
They could have built a cheap and reusable space plane. The problem was they built it do far more than was necessary. You can build a "cheap" space-plane that get's 7 people to orbit at around 100-1000$/lb. (by cheap somewhere under 10 million a flight.) You can't build a cheap space plane that hauls up 7 people and 50,000LB of junk into space at back at the same time. If they just focused on people they could have a…
That would push the costs down by a factor of ten, at least. For man-rated space flight!
What is the NASA track record for big projects that push costs down?
(Didn't Burt Rutan have some story of when he built some high altitude air plane on an order -- and the NASA space suit integration team was larger than the team to design and build the aircraft?)