Earlier quoted context omitted.
> surely the cost per unit would go down, and launch more than one? Surely? They didn't build a JWST factory. It might go up, as people with specialized skills or knowledge have moved on.
I think the verb tenses were not perfect... I think he just meant: why did they build only 1 in the first place? They could have built N instead, at a lower cost per unit.
The James Webb Space Telescope has passed the final mission analysis review
171–180 of 301 posts
Re: The James Webb Space Telescope has passed the final mission analysis review
#172Earlier quoted context omitted.
I don't know why, but I've had this gut-wrenching feeling for a couple of years now that Something Terrible is going to happen to this before it gets into position at L2. I really hope not, obviously, but this seems like an All Your Eggs In One Basket lesson in the making. We need to commodify this tech, make them somewhat disposable, and sent oodles of them up on Starships.
Using 3 COTS (Commercial Off The Shelf) components with 90% reliability can ensure 99.9% redundancy instead of having a Unique very reliable and even costlier 99.9% custom component can really lower costs. But it can happen only if mass is not a constraint. From Casey Handmer's blog: https://caseyhandmer.wordpress.com/2021/03/04/sls-what-now/ The Perseverance Mars rover cost $2.4 billion, which works out to a few tho…
Re: The James Webb Space Telescope has passed the final mission analysis review
#173Earlier quoted context omitted.
> Was the F-35 necessary for threat mitigation. No. Was it framed as the necessary for cost savings, yes. I think we're saying the same thing. The argument is, "Was the F22/F18/Fwhatever/weapon-system necessary for threat mitigation? Yes." With that said, if proponents of the F35 want to frame it as "threat reduction + cost savings" that's how they get the budget approved. But the point stands that without a threat,…
I don’t think it’s a great example of using existential threat for sales, when the whole thing was sold as a cost saving. Pretty much everyone at the time just wanted more F-22s. I was a technical advisor on the project.
The Navy and Marine Corps didn't, especially after development of the Naval variant of the F-22 was cancelled in 1991.
Re: The James Webb Space Telescope has passed the final mission analysis review
#174Going to be amazing if this thing can actually unfurl, but I'm scared.
I don't know why, but I've had this gut-wrenching feeling for a couple of years now that Something Terrible is going to happen to this before it gets into position at L2. I really hope not, obviously, but this seems like an All Your Eggs In One Basket lesson in the making. We need to commodify this tech, make them somewhat disposable, and sent oodles of them up on Starships.
"Oops, JWST blew up, guess we just got unlucky with that single draw from the urn. Shouldn't have put all our eggs in one basket. "
Just do it. No more urn thinking. Just launch , get in orbit and blow our minds with the data that is sent back. I don't want to hear about anything less than that.
Re: The James Webb Space Telescope has passed the final mission analysis review
#175Earlier quoted context omitted.
Do you know if there is any test footage of that anywhere? That's, to me anyway, the second most amazing thing about the sky crane...that I can't find a single frame of it in operation on earth.
Earth physics are different from Mars physics. What works there wouldn't work here; can't just try it out and see if it works.
FWIW they tested missile defense 'kill vehicles' on the ground and they will operate at or near orbital velocity in space. The main 'hover thruster' would likely be completely unnecessary in a live exercise:
Re: The James Webb Space Telescope has passed the final mission analysis review
#176Earlier quoted context omitted.
I don’t think it’s a great example of using existential threat for sales, when the whole thing was sold as a cost saving. Pretty much everyone at the time just wanted more F-22s. I was a technical advisor on the project.
> I don’t think it’s a great example of using existential threat for sales, when the whole thing was sold as a cost saving. Again, if there is no threat (perceived or real), there is no need for a weapons system, period. Think of it this way, if there was a proposal for a cost savings for an anti-spacecraft/anti-asteroid system mounted to the JWST? I'm saying no, because there is no credible threat that would prevent…
The JSF were sold around cost savings; half the price so you could buy twice as many.
Re: The James Webb Space Telescope has passed the final mission analysis review
#177When I look at project management for the small projects (1-20 people) I am working on I always wonder how projects of such a complexity are managed. It must be freakishly difficult to coordinate all the pieces. The people working on this will also have several stressful months ahead of them. From launch to full deployment so many things can go wrong and there is nothing that can be done when something fails.
Re: The James Webb Space Telescope has passed the final mission analysis review
#178When I look at project management for the small projects (1-20 people) I am working on I always wonder how projects of such a complexity are managed. It must be freakishly difficult to coordinate all the pieces. The people working on this will also have several stressful months ahead of them. From launch to full deployment so many things can go wrong and there is nothing that can be done when something fails.
I wonder the same for large (especially international) companies, government bureaucracies or other organizations. With thousands of employees and branches in different locations, it must be impossible to get a full understanding of the state of the system.
Building a model for the system is indeed a big part of the challenge. These days it's increasingly done as a fully detailed software simulation. The big CAD packages have specific functionality for this now. For example SpaceX runs on Siemens NX, and you can wade through their marketing speak to get some idea of how it works. CATIA is also popular with aerospace companies, and Autocad's products with architecture.
Re: The James Webb Space Telescope has passed the final mission analysis review
#179Earlier quoted context omitted.
I don’t think it’s a great example of using existential threat for sales, when the whole thing was sold as a cost saving. Pretty much everyone at the time just wanted more F-22s. I was a technical advisor on the project.
> Pretty much everyone at the time just wanted more F-22s The Navy and Marine Corps didn't, especially after development of the Naval variant of the F-22 was cancelled in 1991.
The stealth window of usefulness is closing anyway with improved radar.
Re: The James Webb Space Telescope has passed the final mission analysis review
#180Earlier quoted context omitted.
> surely the cost per unit would go down, and launch more than one? Surely? They didn't build a JWST factory. It might go up, as people with specialized skills or knowledge have moved on.
I think the verb tenses were not perfect... I think he just meant: why did they build only 1 in the first place? They could have built N instead, at a lower cost per unit.
If it fails, they'll learn all they can, then try again with another follow on project, that likely will take advantage of technological improvements since functional requirements on this one were set in stone. Pre-building a spare just doesn't make sense with this kind of project.