https://twitter.com/olesovhcom/status/1369504527544705025 "Update 5:20pm. Everybody is safe. Fire destroyed SBG2. A part of SBG1 is destroyed. Firefighters are protecting SBG3. no impact SBG4."
For some context: “SBG1, the first Strasbourg data center, consisting of twelve containers, came online in 2012. The 12 containers had a capacity of 12,000 servers. SBG2 is a non-container data center in 2016 using its “Tower” design with a capacity of 30,000 servers. SBG3 tower was built in 2017 with a capacity of 30,000 servers. SBG4 was built in 2013 as several containers to augment capacity, but was decommissione…
> OVH to Disassemble Container Data Centers after Epic Outage in Europe
> “This is probably the worst-case scenario that could have happened to us.”
> OVH [...] is planning to shut down and disassemble two of the three data centers on its campus in Strasbourg, France, following a power outage that brought down the entire campus Friday, causing prolonged disruption to customer applications that lasted throughout the day and well into the evening.
https://www.datacenterknowledge.com/uptime/ovh-disassemble-c...