Earlier quoted context omitted.
But rails were invented for a reason - they're drastically more efficient. So doesn't this just trade lower upfront costs for much higher operational costs (in energy consumption per mile travelled)?
I hope this is a joke, but if not please look into the cost and timeliness of subway maintenance costs by unionized workforce’s dealing with things like switching and signaling equipment - your claim is that this is drastically more efficient than some car mechanics? And if your number is low - you are not counting deferred maintenance which is huge in these systems
The Boring Company’s Las Vegas tunnel is nearly 50% done
191–200 of 303 posts
Re: The Boring Company’s Las Vegas tunnel is nearly 50% done
#192Earlier quoted context omitted.
You're bad mouthing someone who regularly lands rockets on ships in the ocean and has bootstrapped the first electric car company. I think Elon deserves the benefit of the doubt here.
I'm a fan of Elon but he did not bootstrap the first electric car company. Electric cars have been around since the 1800s with a resurgence in the late 1900s. Musk got into electric cars in the 2000s.
I guess if we're being pedantic, he also didn't bootstrap Tesla.
Re: The Boring Company’s Las Vegas tunnel is nearly 50% done
#193Earlier quoted context omitted.
Toronto can't build a subway stop for under 1 billion. I would imagine someone like Elon could could dig a complete line with a dozen stops for 1 billion. It's amazing how he creates companies and solutions on a whim that revolutionize complete industries.
What's amazing to me is that we built the Golden Gate bridge for $35 million in 1933 (would be $688 million in today's dollars) and it only took 4 years. The Empire State building was built in one year (1930). What happened to our ability to build massive structures quickly? Is it amazing that Musk can do things so quickly or is it just that we got so fucking slow on everything that it seems amazing?
Re: The Boring Company’s Las Vegas tunnel is nearly 50% done
#194Earlier quoted context omitted.
Elon's making bold claims about how he's going to disrupt the tunnelling industry but so far the results are unimpressive to say the least. Tunnel boring is a complex, multi-faceted civil engineering discipline with a large number of well-funded firms that are aggressively competing and innovating. In this space Elon is utterly insignificant. The ELI5 version is: "Elon thinks he can dig tunnels faster and cheaper tha…
You're bad mouthing someone who regularly lands rockets on ships in the ocean and has bootstrapped the first electric car company. I think Elon deserves the benefit of the doubt here.
That doesn’t mean it doesn’t sometimes happen, but at this point there’s no evidence that the Boring Company is really doing anything particularly novel at this point...
Re: The Boring Company’s Las Vegas tunnel is nearly 50% done
#195Earlier quoted context omitted.
There's also no difference between a rocket and a rocket, until you figure out how to make one cheaper than the other.
The difference between one that falls into the ocean and one that brings itself back down into orbit and lands safely is one is cheaper than the other?
In the case of Boring, a tunnel is a tunnel, but if they can make them cheap and fast, that opens up a bunch of possibilities for improving transit.
Re: The Boring Company’s Las Vegas tunnel is nearly 50% done
#196Earlier quoted context omitted.
Induced demand = the product is actually being used . The hoary old cliché that says, "Building roads just increases congestion," is nothing more than an exercise in measuring the wrong thing. Market demand, induced and otherwise, is a good thing, if the externalities are also addressed. That's basically Musk's whole business model.
Infrastructure operates differently from a good or service where you have a multitude of often interchangeable selections. The easy availability of roads leads to more people driving since it's the more effective option, which in turn leads to more traffic. Eventually the system reaches equilibrium where it's busy enough that other alternatives are more desirable. Time and time again predictions of apocalyptic traffi…
The only problem is cost. For a city to out build unmet demand they would need to get to add several dozen layers of road, one on top of another (that is bridges over bridges for 12 layers). Nobody would seriously propose building such a thing. If we had it the mobility of the city would allow people to accomplish more things in the city than they can today.
Re: The Boring Company’s Las Vegas tunnel is nearly 50% done
#197Earlier quoted context omitted.
We’ve been building houses for millennia and construction is still notorious for not going according to plan. One-off projects are just hard to get to go as planned.
Lesson: don't do one-off projects. Find a project that meets you needs, and copy it. Make minor tweaks to their design to fit your needs, but copy as much as possible. Houses typically go according to plan because so many of the processes and parts are standard. Even large mansions can go according to plan if you have good management (note that cheap management is rewarded for change orders and thus will ensure thing…
Re: The Boring Company’s Las Vegas tunnel is nearly 50% done
#198Earlier quoted context omitted.
That Sydney Metro tunnel is coming in at nearly double the initial budgeted cost. It's over $1B per km of tunnel. Australian infrastructure projects are hardly something to be proud of.
The MTA's Second Avenue line in New York comes out to more than AU$2Bn per km, on my reckoning (US$2.6Bn/mile). It's the current world champion for expensive holes. The fact is that megaprojects basically never come in anywhere near their schedule or budget. That's because of a selection bias. When you crunch the numbers honestly, megaprojects come out as a terrible on a cost-benefit or ROI analysis. The ones that ge…
https://www.nytimes.com/2017/12/28/nyregion/new-york-subway-...
Re: The Boring Company’s Las Vegas tunnel is nearly 50% done
#199Earlier quoted context omitted.
Except this 10% of cost is just a marketing ploy by Musk to sell you the project. When you compare to the price of subways in Europe, this isn't any cheaper. North America is extremely bad at building cheap subways, but other places of the world have already achieved it.
I personally know people that work at SpaceX (because my wife works there). Reusable rockets weren't a cheap marketing ploy. I don't have personal contact with anyone at the Boring Company, but it's located right across the street from SpaceX in Hawthorne, and I know that many of the people there are from SpaceX. In fact, I just drove past the test tunnel there this morning, as I dropped her off at work. I might be b…
Re: The Boring Company’s Las Vegas tunnel is nearly 50% done
#200Earlier quoted context omitted.
Big Bertha is roughly 25x the size of boring company's tunnel borer. And, while your math it totally wrong for Big Bertha, it should be 0.5 miles/yr. But if you account for the 2 years that it wasn't running for repairs then it does end up at roughly 1.3 miles/yr. Why not compare against a tunnel borer of the same size? The world's fastest tunnel borer of that size was for the tunneling of the blue mountains (describ…
They are currently building their first prototype. It seems correct that you would build a few tunnels using conventional equipment to gain experience before setting your sights on improving the state of the art, or is there something I'm missing?
Rockets were a small enough niche that there were improvements possible if someone invested in them. It isn't clear if such improvements are even possible. (meaning they might be)