The Boring Company’s Las Vegas tunnel is nearly 50% done
121–130 of 303 posts
Re: The Boring Company’s Las Vegas tunnel is nearly 50% done
#122Isn't this just describing building a small but fancy subway system? Honest question: what's the novel "wow" factor that I'm missing?
Re: The Boring Company’s Las Vegas tunnel is nearly 50% done
#123Earlier quoted context omitted.
They're using standard tunnel boring machines same as anyone else. It's not clear what their "special sauce" is that's supposed to enable them to do it at one-tenth the cost. So far they haven't delivered. As for LA, you've had ample opportunity to expand your subway system over the past decades to solve this problem, it's just never actually been done. It's not clear how Boring Company changes anything. I would love…
LA has expanded its rail system quite dramatically in the past decade and will be opening a new rail line next year... It turns out the expensive part was not the digging. It was moving undisclosed utility lines and building the stations. Moving undisclosed utility lines is almost singlehandedly the reason the regional connector and Crenshaw lines are over budget.
Re: The Boring Company’s Las Vegas tunnel is nearly 50% done
#124Earlier quoted context omitted.
I think this follows Elons pattern of being able to find areas where the fundamental technology has advanced and is available, but the integration and step up to a new level hasn't been invested in yet. I think the Boring company basically made more efficient custom built tunneling equipment.
Actually Musk leased an existing Canadian boring machine: http://superexcavators.com/news/super-excavators-consult-mac... There is no evidence of any improvements or innovations.
Re: The Boring Company’s Las Vegas tunnel is nearly 50% done
#125ELI5... why is digging a tunnel tech news? Does Elon dig them faster or more cheaply or something? Otherwise do I submit this to HN? https://www.sydneymetro.info/tunnelling . I think tunnels are the future though for cities. But I'd prefer trains to be running in them, or roads that only allow electric public transport. Edit. In 1988 they started work on the Channel Tunnel UK to France: https://en.wikipedia.org/wiki/…
Re: The Boring Company’s Las Vegas tunnel is nearly 50% done
#126Earlier quoted context omitted.
That Sydney Metro tunnel is coming in at nearly double the initial budgeted cost. It's over $1B per km of tunnel. Australian infrastructure projects are hardly something to be proud of.
The MTA's Second Avenue line in New York comes out to more than AU$2Bn per km, on my reckoning (US$2.6Bn/mile). It's the current world champion for expensive holes. The fact is that megaprojects basically never come in anywhere near their schedule or budget. That's because of a selection bias. When you crunch the numbers honestly, megaprojects come out as a terrible on a cost-benefit or ROI analysis. The ones that ge…
Re: The Boring Company’s Las Vegas tunnel is nearly 50% done
#127Earlier quoted context omitted.
That Sydney Metro tunnel is coming in at nearly double the initial budgeted cost. It's over $1B per km of tunnel. Australian infrastructure projects are hardly something to be proud of.
The MTA's Second Avenue line in New York comes out to more than AU$2Bn per km, on my reckoning (US$2.6Bn/mile). It's the current world champion for expensive holes. The fact is that megaprojects basically never come in anywhere near their schedule or budget. That's because of a selection bias. When you crunch the numbers honestly, megaprojects come out as a terrible on a cost-benefit or ROI analysis. The ones that ge…
[0] http://nymag.com/intelligencer/2019/05/new-york-infrastructu...
Re: The Boring Company’s Las Vegas tunnel is nearly 50% done
#128Earlier quoted context omitted.
The MTA's Second Avenue line in New York comes out to more than AU$2Bn per km, on my reckoning (US$2.6Bn/mile). It's the current world champion for expensive holes. The fact is that megaprojects basically never come in anywhere near their schedule or budget. That's because of a selection bias. When you crunch the numbers honestly, megaprojects come out as a terrible on a cost-benefit or ROI analysis. The ones that ge…
But it's just a subway tunnel, which have been built in cities since the 19th century. Is it really so much harder to do such "megaprojects" in the 21st century, with the vastly better equipment now available?
Re: The Boring Company’s Las Vegas tunnel is nearly 50% done
#129Earlier quoted context omitted.
Along with the tunnelling speed improvements from what I'm gathering they are using model X chassis vehicles within the tunnels. The benefit of this is that you don't need rails, just line following sensors. There's no brake replacement because of regen etc. The main takeaway is that the carriage system will be able to be maintained by car mechanics and not locomotion engineers. What the stations will look like will…
But rails were invented for a reason - they're drastically more efficient. So doesn't this just trade lower upfront costs for much higher operational costs (in energy consumption per mile travelled)?
Re: The Boring Company’s Las Vegas tunnel is nearly 50% done
#130Earlier quoted context omitted.
Along with the tunnelling speed improvements from what I'm gathering they are using model X chassis vehicles within the tunnels. The benefit of this is that you don't need rails, just line following sensors. There's no brake replacement because of regen etc. The main takeaway is that the carriage system will be able to be maintained by car mechanics and not locomotion engineers. What the stations will look like will…
But rails were invented for a reason - they're drastically more efficient. So doesn't this just trade lower upfront costs for much higher operational costs (in energy consumption per mile travelled)?
And if your number is low - you are not counting deferred maintenance which is huge in these systems