The Boring Company’s Las Vegas tunnel is nearly 50% done
1–10 of 303 posts
Re: The Boring Company’s Las Vegas tunnel is nearly 50% done
#2Re: The Boring Company’s Las Vegas tunnel is nearly 50% done
#3Re: The Boring Company’s Las Vegas tunnel is nearly 50% done
#4It also says that they’re 6 football fields in: 1800 ft. This is only 35% of the stated mile length for the tunnel. Under what metric is this tunnel or project 50% complete?
Re: The Boring Company’s Las Vegas tunnel is nearly 50% done
#5The article is confusing. It says that they are supposed to deliver two tunnels - are both going on at the same time? It also says that they’re 6 football fields in: 1800 ft. This is only 35% of the stated mile length for the tunnel. Under what metric is this tunnel or project 50% complete?
https://www.reviewjournal.com/business/conventions/boring-co...
So I think the Teslarati article just rounded 4,300 feet up to "a mile" (=5,280 feet). 1900/4300 = 44%.
Re: The Boring Company’s Las Vegas tunnel is nearly 50% done
#6The Strip itself could use the whole length of the tunnel, so whatever this is connecting to is going to be more limited then it might sound from the article.
Re: The Boring Company’s Las Vegas tunnel is nearly 50% done
#7Re: The Boring Company’s Las Vegas tunnel is nearly 50% done
#8Re: The Boring Company’s Las Vegas tunnel is nearly 50% done
#9This all just seems like subways from first principles but probably worse.
Re: The Boring Company’s Las Vegas tunnel is nearly 50% done
#10The Strip, McCarran airport, and downtown are not within one or two miles of each other. They are further apart than that so there must be something else to it. The Strip itself could use the whole length of the tunnel, so whatever this is connecting to is going to be more limited then it might sound from the article.