Live data from Hacker News

BART slows rollout of new trains as it contends with more repairs than expected

sfchronicle.com

31–40 of 109 posts

Re: BART slows rollout of new trains as it contends with more repairs than expected

#31

About 20 to 25 years ago, I took a trip from the US (where I'd lived most of my life) to travel around Europe by train, and I was immensely impressed by its far superior train system. The best trains of all the countries I visited were in Sweden, which had trains which were so modern that they seemed like something out of the future, even compared to the best trains I'd seen in the US by that time, Amtrak trains. The…

It’s not really a fair comparison. In terms of where people actually live (the upper two thirds of Sweden is almost empty) its roughly comparable to Ohio: about ten million people clustered in 4 or 5 major cities within a few hours drive distance from each other. Of course it will be easier to provide superior rail service there. This is not so say that Ohio has its act together as far as public transit is concerned…

Is there any Ohio-sized area in the US that has a system comparable to the Swedish one?

Re: BART slows rollout of new trains as it contends with more repairs than expected

#32
post #4

The Swiss national train company has their own share of issues with trains built by Bombardier. After years of delays, what was finally delivered is horribly unreliable and passengers also don't like the shaking feeling when they do run. https://de.wikipedia.org/wiki/SBB_RABe_502 Two examples doesn't make a trend, but seeing how similar the issues are, maybe there is some systemic issue plaguing them.

Bombardier produced the new IC2 trains in Germany. There were a lot of issues (including the carriages rocking from side to side which made people sick) and things breaking repeatedly. Seems like Bombardier's MO.

Re: BART slows rollout of new trains as it contends with more repairs than expected

#33
post #16

Manchester's Metrolink uses Bombardier M5000's ( https://en.wikipedia.org/wiki/Bombardier_M5000 ) that seem to have worked OK. But I do wonder - is there anyone other than Bombardier who makes tram/underground vehicles these days?

Alstom did only a few years ago, I assume they're still in that business today but not sure.

Yeah, Alstom is supplying for the Ottawa LRT [1]. They've been plagued by their own issues.

[1] https://www.alstom.com/our-solutions/rolling-stock/citadis-s...

https://en.wikipedia.org/wiki/Alstom_Citadis_Spirit

Re: BART slows rollout of new trains as it contends with more repairs than expected

#34

About 20 to 25 years ago, I took a trip from the US (where I'd lived most of my life) to travel around Europe by train, and I was immensely impressed by its far superior train system. The best trains of all the countries I visited were in Sweden, which had trains which were so modern that they seemed like something out of the future, even compared to the best trains I'd seen in the US by that time, Amtrak trains. The…

It’s not really a fair comparison. In terms of where people actually live (the upper two thirds of Sweden is almost empty) its roughly comparable to Ohio: about ten million people clustered in 4 or 5 major cities within a few hours drive distance from each other. Of course it will be easier to provide superior rail service there. This is not so say that Ohio has its act together as far as public transit is concerned…

We're talking about one of the richest parts of the US.

Re: BART slows rollout of new trains as it contends with more repairs than expected

#35
> “I don’t know everything these new trains can do — they probably have artificial intelligence or something — but I know they’re better than these buckets of steel we’re sitting in,” said Board President Bevan Dufty.

Maybe this guy shouldn’t be president of the BART board? I mean, lots of other people quoted in the article seem to know what they do.

Re: BART slows rollout of new trains as it contends with more repairs than expected

#36

> “I don’t know everything these new trains can do — they probably have artificial intelligence or something — but I know they’re better than these buckets of steel we’re sitting in,” said Board President Bevan Dufty. Maybe this guy shouldn’t be president of the BART board? I mean, lots of other people quoted in the article seem to know what they do.

Great quote considering the trains are made of aluminum.

Re: BART slows rollout of new trains as it contends with more repairs than expected

#37

Manchester's Metrolink uses Bombardier M5000's ( https://en.wikipedia.org/wiki/Bombardier_M5000 ) that seem to have worked OK. But I do wonder - is there anyone other than Bombardier who makes tram/underground vehicles these days?

As mentioned Siemens (SF Muni) and Stadler (SMART) both make trains. Both have had some fairly serious problems, but none quite as bad as BART is having.

Re: BART slows rollout of new trains as it contends with more repairs than expected

#38

Why are they buying new trains instead of fixing the tracks? There are many places on the BART system where the track have not been replaced in so long that trains have to slow to a crawl for safety reasons. New trains don't solve that.

“In 2018, we replaced 22 miles of track, reprofiled 231.6 miles of track to reduce railway noise, overhauled a critical track section near the West Oakland and 12th Street Stations, and replaced five miles of 34.5 kV electrical cable system in downtown Oakland to provide reliable power for trains. All these improvements will collectively create a more reliable, quieter, smoother and safer experience for our riders.”

https://www.bart.gov/better-bart

Re: BART slows rollout of new trains as it contends with more repairs than expected

#40
post #19

> BART gets to withhold the last 5 percent payment for the $2.5 billion fleet until both sets of cars hit their maintenance targets Is it just me or does 5% not seem like nearly a large enough percent? If I only had to hit 20% of my expected performance in exchange for 95% of my pay... I would have a lot more hobbies.

Most of these large capital contracts leave very little money for profit upfront. That comes from long term maintenance. If they are the lowest bidder they are probably losing money even at 95% payout.

Perhaps, but it sounds like they are set to make a killing on maintenance.
Post reply on HN