The cost argument is always interesting to me, when you consider it in context. We (in America) recently passed a tax cut that will cost around $150B/year for the next 10 years, and likely more if the temporary parts are made permanent. Even with cost overruns, that's almost enough to pay for 2 California bullet trains PER YEAR for the next decade. And yes, I know California is just 1 state out of 50, but even still,…
Only 31% of California voters want to keep paying for bullet train
31–40 of 119 posts
Re: Only 31% of California voters want to keep paying for bullet train
#32The cost argument is always interesting to me, when you consider it in context. We (in America) recently passed a tax cut that will cost around $150B/year for the next 10 years, and likely more if the temporary parts are made permanent. Even with cost overruns, that's almost enough to pay for 2 California bullet trains PER YEAR for the next decade. And yes, I know California is just 1 state out of 50, but even still,…
Re: Only 31% of California voters want to keep paying for bullet train
#33This is the upper middle class robbing poor people. The projected fare would be $86 per ticket, about triple the cost of driving for a family of four. The people who are going to pay that are upper middle class travelers and business travelers. Which would be fine if the project was paying for itself, but it won’t be. It’ll be state subsidies for high income professionals. That money could be doing so much good (scho…
Re: Only 31% of California voters want to keep paying for bullet train
#34Trains with modern power sources seem like a really good idea; the rest is project management.
Re: Only 31% of California voters want to keep paying for bullet train
#35"In July 2014 The World Bank reported that the per kilometer cost of California's high-speed rail system was $56 million, more than double the average cost of $17–21 million per km of high speed rail in China and more than the $25–39 million per km average for similar projects in Europe."
"As of May 2015, both construction packages awarded have come in significantly under staff estimates."
"In December 2016, an internal-use-only draft risk assessment produced by the Federal Railroad Administration was delivered to the California Rail Authority which warned that the ICS (Merced-Bakersfield) segment could cost as much as $9.5 billion instead of the $6.4 billion originally budgeted"
Re: Only 31% of California voters want to keep paying for bullet train
#36Question 26 is the headline.
Question 25 is In general, do you [oppose] or [support] California’s project to build a high-speed rail system connecting Los Angeles, the Central Valley, and San Francisco?
Strongly/somewhat Support =49 Strongly/somewhat Oppose = 43
Cross Tabs break these question down by race, education, political party, age, region, etc: https://drive.google.com/file/d/1p1sIIQSUED6MwcGxVYcImDAsn7e...
Re: Only 31% of California voters want to keep paying for bullet train
#37Killing it would be short-sighted. If it gets killed, there would probably never be the opportunity to build it ever again. California is flush with tech money, put some of it to good use.
Re: Only 31% of California voters want to keep paying for bullet train
#38Earlier quoted context omitted.
Yes, it was quite nefarious of them to alter the laws of physics and geology to make tunneling through the mountains outside LA into a nigh-impossible engineering task.
Correct, there is no freeway that passes through those impassable mountains. /s
Re: Only 31% of California voters want to keep paying for bullet train
#39Killing it would be short-sighted. If it gets killed, there would probably never be the opportunity to build it ever again. California is flush with tech money, put some of it to good use.
Killing it would be far sighted. Technology is improving transportation methods, we have buses and planes that can do the same thing as this train at much cheaper rates and without tax dollars to construct or maintain.
Tax dollars pay for road construction and maintenance. Tax dollars also subsidize airport construction and operation.
Re: Only 31% of California voters want to keep paying for bullet train
#40This website is blocked in Europe.