This looks really cool. However, boring through rock is the most expensive way to connect 2 places. It only makes sense if the land features or purchase value require it. Fundamentally, this is about short-circuiting the regular road network and establishing a managed packet network that can bypass congestion. Interestingly, that's also the value proposition of public transit, though it also runs into issues of cost,…
Regarding the boring expense, an NTBM[1] or subterrene[2], is said to be cheaper and faster. [1] http://www.sheepletv.com/nuclear-tunnel-boring-machines-swit... [2] https://en.wikipedia.org/wiki/Subterrene My impression is the boring feasibility and costs will not be the limiter of a very cool tech like this happening, but a more boring practical cost, probably the "zoning" cost required to get compliance and permiss…
I'm not convinced that the video you linked on sheepletv above the "underground alien bases" one is the most reliable info.