#2What I actually use when preparing estimates?
40%-75% which depends on stuff like the developer being staffed, how short the project is (shorter = more productive), how bleeding edge the tech is (higher tech = less productive), etc.
Re: Ask HN: What is the expected capacity for a full time developer?
#3Re: Ask HN: What is the expected capacity for a full time developer?
#4Re: Ask HN: What is the expected capacity for a full time developer?
#5Re: Ask HN: What is the expected capacity for a full time developer?
#6Lines of code, bugs per hour (clised?, created?, avoided?), revenue per month (a contractor standard), etc.
Utilization is different from productivity.
Re: Ask HN: What is the expected capacity for a full time developer?
#7That was with a fairly low amount of BS. If there a lot of meetings then lower it. If you work in an open plan work space with people not directly contributing to the same effort, lower it some more.
Re: Ask HN: What is the expected capacity for a full time developer?
#8Officially, we're expected to do 6 hours of coding per day. However with meetings and lunch, we only really have 4.5 - 5 hours of time that isn't blocked off.
Then, because some meetings aren't scheduled back to back, we essentially lose the time in the middle (especially if that time is only ~30 minutes).
When all is said and done, I'm probably putting in 3-4 hours of code in per day on average. It's more than enough to get the job done.
It's soul crushing and I'm looking to quit soon.