Re: 3D printing a building with 756 windows
#2That said, very good job and writeup.
Re: 3D printing a building with 756 windows
#3Re: 3D printing a building with 756 windows
#4The Empire State Building is 102 floors (not including the 200 foot pinacle on top) and was completed in about 78 weeks (including interior finishing), so I'm not sure the math works out here.
The CBR building is 9 floors and took about twice as long as the Empire State Building to build.
Re: 3D printing a building with 756 windows
#5> This then-novel construction technique allowed the building to go up at a record speed of one floor per week; a billboard on-site proudly recorded the time each floor took. The Empire State Building is 102 floors (not including the 200 foot pinacle on top) and was completed in about 78 weeks (including interior finishing), so I'm not sure the math works out here. The CBR building is 9 floors and took about twice as…
Re: 3D printing a building with 756 windows
#6> This then-novel construction technique allowed the building to go up at a record speed of one floor per week; a billboard on-site proudly recorded the time each floor took. The Empire State Building is 102 floors (not including the 200 foot pinacle on top) and was completed in about 78 weeks (including interior finishing), so I'm not sure the math works out here. The CBR building is 9 floors and took about twice as…
The Empire State Building was a legendarily fast build, I don't think being slower than it means this is bad. For example, the One World Trade Center took 4 weeks per floor.
Re: 3D printing a building with 756 windows
#7> This then-novel construction technique allowed the building to go up at a record speed of one floor per week; a billboard on-site proudly recorded the time each floor took. The Empire State Building is 102 floors (not including the 200 foot pinacle on top) and was completed in about 78 weeks (including interior finishing), so I'm not sure the math works out here. The CBR building is 9 floors and took about twice as…
I'm partial to LiftBuild's method of building the central tower first, and then constructing each floor at ground level and hoisting it up the tower and into place. The bulk of construction is done on the ground, faster building with less rigging and safety requirements. I think they averaged 10 days per floor on their last build.
Re: 3D printing a building with 756 windows
#8Re: 3D printing a building with 756 windows
#9Then what happens if any of the glass needs to be replaced due to breakage? Sounds like a short-sighted design choice.
Re: 3D printing a building with 756 windows
#10"Furthermore, the glass was embedded into the cement modules in the factory" Then what happens if any of the glass needs to be replaced due to breakage? Sounds like a short-sighted design choice.
The sentence you quoted continues:
> protecting the floors from the elements and allowing work to progress on the interior as floors above were still under construction.
so it seems the main benefit was that the construction could be pipelined better as the already in place glass helped shelter the interior.