Earlier quoted context omitted.
Have you seen the demo's of "truck pack" batteries being removed from prime mover, transferred to charge station, replaced with already charged truck pack, all done with a mini fork lift? It's a 15 minute roll in / roll out kind of turn around. The game's not over and the big transport operators (eg: Rio Tinto mine fleets moving a billion tonne per annum, etc) are still doing the R&D pipeline and trialling pilots.
> It's a 15 minute roll in / roll out kind of turn around. Now you just need every gas station in the US to stock a bunch of swappable batteries for every semi brand. It's a great idea s long as you're not bound by any sort of realistic expectation.
Also, not the first industry that would rely on some level of standardisation.