Keeping master green at scale
91–100 of 120 posts
Re: Keeping master green at scale
#92Earlier quoted context omitted.
I like it at Google!
Google has the team + tooling to properly support it. The same cannot be said for many other orgs.
Every problem you could have with bad dependencies is entirely self-inflicted. The Right Thing™ is to choose a known-good version, and update when you have the bandwidth to pay down the tech debt.
Re: Keeping master green at scale
#93Quite a premise: "Giant monolithic source-code repositories are one of the fundamental pillars of the back end infrastructure in large and fast-paced software companies."
Which huge successful software companies don't use a monorepo?
Re: Keeping master green at scale
#94Earlier quoted context omitted.
I don't want to come across as negative, but just an observation and to play devil's advocate - wouldn't it be better to fix the flaky test or delete it entirely instead of build a feature to disable it during a test run in an automated fashion? Whenever our team has a significant number of flakey tests (more than 1-2) we usually schedule a bug squash session to fix them and amortize the cost over the whole team.
What you really want to do is first disable a test you know is unhealthy to unblock everybody. Then, you fix it. After you've reintroduced it healthy, you can turn it back on.
With this in mind, what Bazel does when a test is marked flaky is run it several times. This is a simple way of minimizing the effect of flakiness while still getting confidence from green tests.
Re: Keeping master green at scale
#95Earlier quoted context omitted.
Package managers solve it quite well. Just depend on the latest version of your dependencies and tag a new version whenever they change.
This doesn’t work when an underlying system changes, and upgrading is mandatory for all clients or package dependants (happens often at scale for a multitude of reasons).
There's always a window where both will be in use, because we can't synchronously replace every running process everywhere (not that it's even a good idea without a canary). The shorter you try to make that window, the more needless pain is created and plans disrupted. While we could use prod to beta test every single version of everything, that shouldn't be our priority.
Re: Keeping master green at scale
#96Earlier quoted context omitted.
Sounds so much simpler outside the context of a 'research' paper: >When an engineer attempts to land their commit, it gets enqueued on the Submit Queue. This system takes one commit at a time, rebases it against master, builds the code and runs the unit tests. If nothing breaks, it then gets merged into master. With Submit Queue in place, our master success rate jumped to 99%. https://eng.uber.com/ios-monorepo/
I can guarantee you that the system that's described in the paper is what we use at production. The blog post that you are pointing to was meant to describe the usage of monorepo at Uber and the challenges we faced at a high level. It didn't dive deep into the submission system and we have the paper to address that :-). (I'm one of the authors as well as the tech-lead of the system.)
Re: Keeping master green at scale
#97There's a nice middle ground between this and a one-at-a-time submit queue: have a speculative batch running on the side. This gives nice speedups (approaching N times more commits, where N is the batch size) with minimal complexity. One useful metric is the ratio between test time and the number of commits per day. If your tests run in a minute, you can test submissions one at a time and still have a thousand succes…
The same thing was (is?) done in openstack with zuul, I believe. When you going to merge something, your branch goes on top of things already going through the CI.
Most of the complexity and suffering of a submit queue evolves from the interactions between your VCS and CI systems. Keeping things simple is great! Kubernetes' CI system is Prow, which runs the tests as pods in a Kubernetes cluster. Dogfooding like this is great, since the team you're providing CI for can also help fix bugs that arise.
Re: Keeping master green at scale
#98Earlier quoted context omitted.
Us, for instance.[0,2] But sure enough, we definitely weren't the first to go down this path. Facebook was using (or developing the tech for) server-side rebasing in 2015.[1] Gitlab provides native server-side rebase functionality, likely inspired by various parties already having developed tools to do the same. These aren't new ideas. But handling them at the scale where you land hundreds or even thousands of commit…
Yours seems identical to Bors, just for Gitlab instead of GitHub? That isn't really what's described in the OP.
The concept of an evergreen master with testing done in branches, followed by automated merges/rebases is not special. Quite a few companies have been doing it for years, it's the off-the-shelf tooling and subsequent publicity that haven't necessarily been around as long.
As for OP's material? The automated conflict resolution via reordering to optimise parallelism - that certainly feels novel.
Re: Keeping master green at scale
#99Earlier quoted context omitted.
If the effort required to mark-disable/comment out/rm a known-unhealthy test is more than a few seconds beyond the efforts to navigate through a tool like the one you describe, I think the problem is likely in the change control/source control processes being employed. That seems like it should be so easy as to not need an additional tool (unless tests are flaking out so often that even the <1min of overhead to disab…
What I've seen in most companies is that when a test goes bad (imagine 10k unit tests, and 1 hits stripe's api sandbox which just went down) the bad test affects everybody who's busy working on their respective feature branches. Everybody wonders how their feature branch broke the stripe integration and you have hundreds of developers trying to diagnose and fix the same broken test. Our solution allows the someone to…
Integration tests are nice, but best if ran separately...
Re: Keeping master green at scale
#100Merge Requests now combine the source and target branches before building, as an optimization: https://docs.gitlab.com/ee/ci/merge_request_pipelines/#combi...
Next step is to add queueing (https://gitlab.com/gitlab-org/gitlab-ee/issues/9186), then we're going to optimistically (and in parallel) run the subsequent pipelines in the queue: https://gitlab.com/gitlab-org/gitlab-ee/issues/11222. At this point it may make sense to look at dependency analysis and more intelligent ordering, though we're seeing nice improvements based on tests so far, and there's something to be said for simplicity if it works.