As much as I'd love more nuclear power on the grid, this project cost over double its initial bid and is actually raising rates for GA utility customers... I can't tell from the story whether "nuclear is hard" or if "contractors are idiots" here. Reactor was supposed to open in 2016 - it's very hard to cheer for a 7-year delay and a 140% cost overrun.
Basically, you can look at [the list of nuclear plants under construction]( https://world-nuclear.org/information-library/current-and-fu... ) and see that the Russians VVER series are still going up around the word (over 20), the Chinese are building a bunch (of many different international and domestic designs, I don't think they've built one for another country yet), the South Koreans have 4 under construction arou…
Supplied energy seems to have leveled out also: https://world-nuclear.org/information-library/current-and-fu...
Time to say goodbye and maybe think hard why those Russian and Chinese reactors come up so fast and cheap, and prepare for the fallout...