We were hosted at Exodus in the Herndon Virginia area around this same timeframe. The staff gave us a small tour and showed us a cage about the size of a double-wide trailer. Inside were two Sun Enterprise 10000 servers and a whole wall of drive arrays. Plus networking gear, tape drives, etc. Easily $7-8 million worth of stuff. They said it was from a search engine we probably had heard of. Our guess was it was Altav…
Hmmm.. I'm pretty sure AltaVista ran on DEC Alpha hardware, not Sun. And Google used self-built high-density racks of Intel hardware. Maybe it was Inktomi? I'm pretty sure they used Sun hardware.
Geocities Cage at the Exodus Datacenter
81–89 of 89 posts
Re: Geocities Cage at the Exodus Datacenter
#82And right there is why Sun was such a hit in the 90s and crushed in the bust.
Everyone in SV in 1999 used Sun boxes. Racking Ultra-2 Pizza Boxes was being very Internet Professional and money was flowing freely enough to pay for them.
Re: Geocities Cage at the Exodus Datacenter
#83We were hosted at Exodus in the Herndon Virginia area around this same timeframe. The staff gave us a small tour and showed us a cage about the size of a double-wide trailer. Inside were two Sun Enterprise 10000 servers and a whole wall of drive arrays. Plus networking gear, tape drives, etc. Easily $7-8 million worth of stuff. They said it was from a search engine we probably had heard of. Our guess was it was Altav…
A week later, in Atlanta at QTS metro, they said almost the exact same words.
Re: Geocities Cage at the Exodus Datacenter
#84We were hosted at Exodus in the Herndon Virginia area around this same timeframe. The staff gave us a small tour and showed us a cage about the size of a double-wide trailer. Inside were two Sun Enterprise 10000 servers and a whole wall of drive arrays. Plus networking gear, tape drives, etc. Easily $7-8 million worth of stuff. They said it was from a search engine we probably had heard of. Our guess was it was Altav…
I think all colos say crap like that. During a tour at switch, they pointed to a large cage and said, "It's a search engine that you all have heard about but I cannot name." A week later, in Atlanta at QTS metro, they said almost the exact same words.
Re: Geocities Cage at the Exodus Datacenter
#85We were hosted at Exodus in the Herndon Virginia area around this same timeframe. The staff gave us a small tour and showed us a cage about the size of a double-wide trailer. Inside were two Sun Enterprise 10000 servers and a whole wall of drive arrays. Plus networking gear, tape drives, etc. Easily $7-8 million worth of stuff. They said it was from a search engine we probably had heard of. Our guess was it was Altav…
Hmmm.. I'm pretty sure AltaVista ran on DEC Alpha hardware, not Sun. And Google used self-built high-density racks of Intel hardware. Maybe it was Inktomi? I'm pretty sure they used Sun hardware.
Yes, they did. Remember - the original URL for altavista was: altavista.digital.com.
Re: Geocities Cage at the Exodus Datacenter
#86And then years later you could download all of Geocities as a few hundred GB Torrent.
Which makes me wonder: what would it take to match the capabilities of this setup with modern hardware?
Re: Geocities Cage at the Exodus Datacenter
#87Earlier quoted context omitted.
In my smaller regional ISP we started off using USR courier and sportster modems with Cyclades cards before moving over to Livingston Port masters. I ended up selling the company before moving to all digital incoming lines (needed to support 56k modems).
Did exactly the same.... We had sporters hanging off the wall for a while (couldn't pack them tightly due to the crappy ventilation on the Sporters, but they were light, so clamping the cables to a suitable plate and fitting it to the wall worked great....) The local telco had problems supplying enough lines from the nearest exchange, so they ended up hanging a thick cable bundle in the trees for several hundred mete…
Re: Geocities Cage at the Exodus Datacenter
#88Earlier quoted context omitted.
Did exactly the same.... We had sporters hanging off the wall for a while (couldn't pack them tightly due to the crappy ventilation on the Sporters, but they were light, so clamping the cables to a suitable plate and fitting it to the wall worked great....) The local telco had problems supplying enough lines from the nearest exchange, so they ended up hanging a thick cable bundle in the trees for several hundred mete…
We got metal wire shelves and kept each shelf fairly close together (about 6-8 inches). We had 10 selves per rack and 18 modems per 3ft x 6ft shelf. 10 racks and related additional hardware (switches, terminals, routers, CSU/DSUs, etc) fit in about 600sq ft of office space with space to spare for technician workbenches. Could do much higher density these days of course, but it was the mid-90s and we thought we were d…
Re: Geocities Cage at the Exodus Datacenter
#89Earlier quoted context omitted.
We got metal wire shelves and kept each shelf fairly close together (about 6-8 inches). We had 10 selves per rack and 18 modems per 3ft x 6ft shelf. 10 racks and related additional hardware (switches, terminals, routers, CSU/DSUs, etc) fit in about 600sq ft of office space with space to spare for technician workbenches. Could do much higher density these days of course, but it was the mid-90s and we thought we were d…
We didn't quite get to the size where we needed that before we sold off the dial up business (for a pittance; we contributed to accidentally set off a price war in our market with incumbents with deep pockets - it was no fun, but I learned a lot)